EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-03
ALL ú ú 01 Page 411 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(b)
Install the cotter pin (14).
S 864-017
(7)
Move the flap control lever to the position of the flaps.
S 864-018 WARNING: THE TRAILING EDGE AND LEADING EDGE FLAPS WILL MOVE TO AGREE
_______ WITH CONTROL LEVER POSITION WHEN ALTERNATE CONTROL IS DISARMED. MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE OUT OF THE PATH OF THE FLAPS.
(8)
Push the ALTN FLAPS ARM switch to disarm alternate control.
I.
Adjust the Aftflaps S 864-019
(1)
Pressurize hydraulic system No. 1 (Ref 29-11-00/201).
S 714-034 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE LE AND TE
_______ FLAPS AND FLAP DRIVE MECHANISMS BEFORE YOU MOVE THE FLAP CONTROL LEVER. WITH HYDRAULIC POWER REMOVED, THE FLAPS WILL MOVE AUTOMATICALLY BY ELECTRICAL POWER WHEN YOU MOVE THE FLAP CONTROL LEVER.
(2) Move the flaps slowly.
NOTE: Make sure the flap components move freely.
____
S 864-030
(3)
Retract the flaps.
S 224-021
(4)
Make sure the aftflap and midflap are adjusted.
NOTE: The flaps must be in the full up position.
____
(a) Make sure that the midflap to aftflap seals are compressed, as shown in view A, Fig. 404.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-03
ALL ú ú 01 Page 412 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(b) Make sure that the clearance between the midflap trailing edge and the aftflap top surface at the supports is 0.10-0.15 inch (0.25-0.38 cm). 1) Add or remove aluminum shims to adjust the clearance.
NOTE:____ Use straight shims at the support struts. tapered shims at the end ribs. Use
2) If you adjusted the clearance, make sure the screws do not touch the aftflap.
(5) S 714-022Make sure that the aftflap moves smoothly.
(6) S 644-023Lubricate the aftflap (Ref 12-21-20/301).
(7) S 864-024Release the pressure in hydraulic system No. 1 (Ref 29-11-00/201).
(8) S 864-025Disconnect electrical power (Ref 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-03
ALL ú ú 01 Page 413 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
INBOARD AFTFLAP - INSPECTION/CHECK
__________________________________
1. General_______
A. There is one task in this procedure; An inspection of the inboard aftflap.
B. In this procedure you measure the inner and outer diameter of the parts which connect the aftflap support arm and spindle. The parts include bushings, pins, bearings, spindles, and bolts. You also examine the axial play in the bushings and bearings.
C. To do the check, you must remove the aftflap from the airplane. The spindle also must be removed from the aftflap. The check is usually done before the aftflap installation.
TASK 27-51-03-206-001
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 4(93)