TASK 27-51-10-002-037
8. Flap Control Check Valve Removal________________________________
A. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 29-11-00/201, Main Hydraulic Supply System
(3)
AMM 32-00-30/201, Landing Gear Door Locks
(4)
AIPC 27-51-09, Fig. 1 and Fig. 3
B.
Access
(1)
Location Zone
137 Body Landing Gear Well, LH
138 Body Landing Gear Well, RH
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-10
ALL ú ú 01 Page 212 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
C. Prepare for the Removal
S 862-038
(1) Make sure that the landing gear ground locks are installed.
S 492-039
WARNING: CAREFULLY DO THE SPECIFIED TASK TO INSTALL THE DOOR LOCKS ON
_______ THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(2)
Install the door locks on the doors for the body landing gear (AMM 32-00-30/201).
S 862-040
(3)
Release the pressure in hydraulic systems No. 1 and No. 4 (AMM 29-11-00/201).
S 862-041
(4)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P6, Main Power Distribution Panel
1) 6L20, TE FLAP ELEC CONT INBD
2) 6L19, TE FLAP ELEC CONT OTBD
D.
Procedure
S 022-042
(1)
Remove the check valve (Fig. 201):
(a)
Disconnect the hydraulic return line (8) from the flap control module (7).
(b)
Remove the check valve (21) from the flap control module (7).
(c)
Install the protective caps on the module port and the hydraulic line.
TASK 27-51-10-402-043
9. Flap Control Check Valve Installation_____________________________________
A. Consumable Materials
(1)
G00062, Fluid - Hydraulic, Fire Resistant, BMS 3-11
(2)
D00054, Lubricant - Assembly, Skydrol, MCS 352
B.
Parts ~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT | FIG | ITEM | ................................................................................ | 201 | 23 | O-ring | 27-51-09 | 01 | 155 | | | 24 | Backup Ring | | | 165 | 2......…........…...................................…...........….....…........1
C.
References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 29-11-00/201, Main Hydraulic Supply System
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-10
ALL ú ú 01 Page 213 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
D. Access
(1)
Location Zone
137 Body Landing Gear Well, LH
138 Body Landing Gear Well, RH
E.
Procedure (Fig. 201)
S 422-044
(1)
Install the check valve:
(a)
Lubricate the backup rings (24) and O-rings (23) with the assembly lube or hydraulic fluid.
(b)
Install the backup rings and o-rings on the check valve (21).
(c)
Remove the protective caps.
(d)
Install the check valve (21) in the flap control module (7).
(e)
Connect the hydraulic return line (8) to the flap control module (7).
S 862-045
(2)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a)
P6, Main Power Distribution Panel
1) 6L20, TE FLAP ELEC CONT INBD
2) 6L19, TE FLAP ELEC CONT OTBD
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 4(148)