52-32-00
ALL ú ú 02 Page 107 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
SPRING (REF)
PLUNGER (REF)
HANDLE LOCKPIN
Side Cargo Door - Component Location (Details from Sht 1)
Figure 102 (Sheet 7)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-32-00
ALL ú ú 02 Page 108 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
ELECTRICAL CONNECTOR (REF)
DOOR STRUCTURE (REF)
FWD R TORQUE AFT HOOK ACTUATOR, X212 TUBE (REF)
(REF) ELECTRICAL CONNECTOR
TORQUE TUBE (REF)
ACTUATOR
ACTUATOR
FORWARD HOOK ACTUATOR, X211
S
Side Cargo Door - Component Location (Details from Sht 1)
Figure 102 (Sheet 8)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-32-00
ALL ú ú 02 Page 109 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
ROTARY ACTUATOR
INPUT
SHAFT (REF) A
ACTUATOR
DRAIN ARM (REF)
(REF)
SEE B
TORQUE A TUBE (REF)
ROTARY ACTUATOR
ACTUATOR LINK (REF)
FWD
SIDE CARGO DOOR (REF)
ROTARY ACTUATOR
T
Side Cargo Door - Component Location (Details from Sht 1) Figure 102 (Sheet 9)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-32-00
ALL ú ú 02 Page 110 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
MAIN EQUIP CTR
Side Cargo Door - Component Location
Figure 102 (Sheet 10)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-32-00
ALL ú ú 02 Page 111 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
CARGO DOOR CONTROL
INTERIOR CONTROL PANEL
SEE
W
BODY SKIN (REF)
INTERIOR CONTROL PANEL
Side Cargo Door - Component Location
Figure 102 (Sheet 11)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-32-00
ALL ú ú 02 Page 112 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
SIDE CARGO DOOR - ADJUSTMENT/TEST
_________________________________
1. General_______
A. This procedure contains three tasks:
(1)
The operational test of the side cargo door
(2)
The system adjustment of the side cargo door
(3)
The system test of the side cargo door.
B.
For a fast check to find the misrigging and deterioration in the rigging of the side cargo door system, refer to 52-32-00/601.
TASK 52-32-00-715-001
2. Operational Test - Side Cargo Door__________________________________
A. Reference
(1)
24-22-00/201, Manual Control
(2)
AIPC 52-32-01, Fig 1
(3)
SSM 52-32-01
(4)
WDM 52-32-11, 52-32-21
B.
Access
(1)
Location Zone
261 Main Deck STA 1720 To STA 2040, LH
(2)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 2(79)