• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

ACTUATOR  POINT OF 
CONTACT 
CAM ROLLER 
LINEAR ACTUATOR  FWD 
SEE  B  PUSH-PULL CAM 
ACTUATOR 
SEE  A 
CAM 
NOSE CARGO DOOR 
PUSH-PULL CAM AND ACTUATOR 
(PUSH-PULL CAM SHOWN IN FULL OPENED POSITION 
AND THE DOOR IS IN THE CLOSED AND RIG POSITION) 

MANUAL 
UPPER GIMBAL  DRIVE PORT 
FITTING 
SEE  D 

DRIVE UNIT  FWD  DRIVE SHAFT FLEXIBLE  COUPLING DRIVE SHAFT  LOWER GIMBAL FITTING  ACTUATOR LINEAR  ACTUATOR AFT END FITTING CSEE 
LINEAR ACTUATOR 
1  THE RIGHT LINEAR ACTUATOR IS SHOWN, THE LEFT LINEAR ACTUATOR IS OPPOSITE.  B  1 
Figure 401 (Sheet 1) Nose Cargo Door Linear Actuator Installation 

B26887
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-02
 ALL  ú ú 02 Page 402 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


Nose Cargo Door Linear Actuator Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-02
 ALL  ú ú 02 Page 403 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C14350
A

747-400
MAINTENANCE MANUAL

LINEAR ACTUATOR (2 LOCATIONS)
FWD  COUPLING DRIVE 
SHAFT DRIVE FLEXIBLE 

SEE  A  B 
MANUAL DRIVE PORT 
AFT END OF 
ACTUATOR SHAFT 
AFT END 
FITTING 

RIG PIN ND-2  RIG HOLE 
RIG POSITION  INSPECTION HOLE 

AFT END OF ACTUATOR MAKES
AN OVERLAP 0.25 TO 0.75 INCH
ON THE INSPECTION HOLE

DOOR LATCHED POSITION
B
Nose Cargo Door Linear Actuator Installation Figure 402
B26889
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-02
 ALL  ú ú 02 Page 404 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 034-007
 (6)  
Disconnect the aft end fitting of the linear actuator from support structure (Detail C).

 (a)  
Remove cross bolt and forward pin.

 (b)  
Disconnect the aft end fitting of the linear actuator from support structure.


 S 034-008
 (7)
Remove the upper gimbal fitting from structure (Detail D).

 (a)  
Remove bolt, washer and nut (3 locations) and remove the upper gimbal fitting.


 S 024-009
 (8)  Remove the linear actuator.
 TASK 52-31-02-404-002
 3. Nose Cargo Door Linear Actuator Installation (Fig. 401, Fig. 402)
____________________________________________
 A. General
 (1)  
Do not operate the door electrically to open or close the door before the linear actuators are correctly adjusted.

 B.
Standard Tools and Equipment

 (1)  
Rig Pin - ND-2, 0.311 (+0.000/-0.002)-inch diameter, 2 inches long (2 required)

 C.
Parts


 ~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT | FIG | ITEM | ................................................................................ | 401 | 1 | | | | TBD | | | 2 | | | | TBD | | | 3 | | | | TBD | | | 4 | | | | TBD | | | 5 | | | | TBD | | | 6 | | | | TBD | | | 7 | | | | TBD | | | 8 | | | | TBD | | | 9 | | | | TBD | | | 10 | | | | TBD | 2......…........…...................................…..........…......…........1
 D. References
 (1)  
24-22-00/201, Manual Control

 (2)  
52-31-00/201, Nose Cargo Door System
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 2(34)