• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:14来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-06
 ALL  ú ú 02 Page 401 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

10R
SEE C 11 SEE D
9R
SEE B
10L
SEE C
9L SEE B
7R 8R
8L LATCH FITTING (TYPICAL)
SEE A6R
5R  7L
6L
4R
5L 3R
4L 2R
3L
1R
2L
1L
BOLT TORQUES
BOLT DIA (INCHES) TORQUE (POUND-INCHES)
____NOTE: SEE A FOR AN EXAMPLE FOR  3/8
450-500 INSTALLATION OF FITTINGS
7/16 740-840
1L THRU 8L AND 1R THRU 8R.
1/2 1150-1300
FITTINGS ON DOOR NOT SHOWN.
FITTING ATTACHMENT BOLT

9/16 1600-1800
HOLES ARE OVERSIZE.
Nose Cargo Door Portal Latch Fitting Installation
Figure 401 (Sheet 1)

B26914
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-06
 ALL  ú ú 02 Page 402 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

LAMINATED SHIM SERRATED PLATES
BODY STRUCTURE
ATTACHMENT BOLTS
FWD
A
BODY STRUCTURE
LAMINATED SHIM
ATTACHMENT BOLT
ATTACHMENT SERRATED PLATES BOLTS
B
Nose Cargo Door Portal Latch Fitting Installation Figure 401 (Sheet 2)
B26915
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-06
 ALL  ú ú 02 Page 403 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 

Nose Cargo Door Portal Latch Fitting Installation
Figure 401 (Sheet 3)

B26917
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-31-06
 ALL  ú ú 02 Page 404 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 D. Actuator-Pin Portal Latch Fitting Removal (Fittigns 1-8 L&R)
 S 934-006
 (1)  
For the latch fittings 7L and 7R, Make a mark for the latch fitting location for installation.

 (a)  
Remove the latch fitting and actuator together as an assembly (AMM 52-31-05/401).


 NOTE: The terminal fitting on the linear actuator interferes
____ with the removal of the latch actuators 7L & 7R. Therefore, the latch actuator and latch fitting must be removed together.
 S 014-007
 (2)  
For all except the latch actuator 7L & 7R,
 Remove the latch actuator (AMM 52-31-05/401).


 S 034-008

 (3)  
Remove the latch indication switch (Ref 52-31-21/401).

 S 034-009

 (4)  
Loosen nut and carefully remove the attachment bolts and fitting to avoid damage to the protective coating.

 S 034-010

 (5)  
Remove the serrated plate and the switch bracket from the latch fitting for installation.

 E.
Fixed-Pin Portal Latch Fitting Removal (Fittings 9-10 L&R and 11)


 S 934-011
 (1)  Make a location marks for the serrated plates between the latch fitting and the body structure for installation.
 NOTE: If there is no location marks, it is difficult to correctly
____ install the serrated plates between the latch fiting and body structure. On the latch fittings 10L & 10R, there is no serrated plates between the latch fitting and body structure.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 2(50)