71-00-03
ALL ú ú C02 Page 217 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
(ag) Remove the pressure from the oil supply line to the fuel pump inlet.
(ah) Remove the oil supply line. (ai) Connect the fuel supply line to the fuel pump inlet. 1) Remove the cap from the fuel supply line. 2) Lightly lubricate the gasket with petrolatum and install it on the inlet port of the fuel pump. 3) Lightly lubricate the bolts (4 locations) for the fuel line flange with grease. 4) Put the fuel line flange on the fuel pump flange, and install the bolts and washers (4 locations). a) Tighten the bolts. (aj) Remove the pressure from the CDP port (false PS3 source). (ak) Remove the cap from the CDP line. (al) Connect the CDP line to the MEC port. 1) Tighten the coupling nut to 135-150 pound-inches (15.3-17.0 Newton meters).
S 412-124-C00
(4) Close the VBV doors if they are open (AMM 75-32-00/201).
S 432-125-C00
(5) Put the vapor barrier film on the VBV bleed grills.
S 432-126-C00
(6) Install caps on all disconnected lines and electrical connections.
S 432-127-C00
(7) Seal the inlet and exhaust openings with the vapor barrier film. (a) Attach the vapor barrier film with tape.
S 432-050-C00
(8) Put the desiccant on each side of the engine, but do not let it touch the engine hardware.
NOTE:____ The dessicant must be replaced at regular intervals based on the weather conditions. Install the dessicant such that it
gives sufficient protection to the engine and also permit access for replacement without damage to the engine protective cover.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-03
ALL ú ú C02 Page 218 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 432-051-C00
(9) Install a waterproof cover on the full power plant.
(a) Tightly attach the waterproof cover to the engine.
S 932-052-C00
(10) Attach a tag to the power plant to show that the fuel system and oil system preservation was done with preservation oil.
(a) Include the date of the preservation procedure.
S 862-053-C00
(11)
Remove the DO-NOT-CLOSE tag and close this circuit breaker:
(a) P6 Main Power Distribution Panel
1) SHUTOFF VALVE ENG
G.
Power Plant Preservation (Not Serviceable) (Fig. 201)
NOTE: If the engine can be motored, use the procedure for a serviceable
____
engine preservation for 30 to 365 days (Ref paragraph C).
S 682-054-C00
(1) Drain the engine fuel system.
(a)
Supply the electrical power (AMM 24-22-00/201). 1) Remove the DO-NOT-OPERATE tag from the BAT switch.
(b)
Make sure the applicable start lever is in the CUTOFF position.
(c)
Make sure the FUEL VALVE CLOSED light on pilots' overhead panel, (P5), is on (dim) to show the valve closed.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 动力装置 POWER PLANT 1(157)