(a)
Use the four ball lock pins.
S 494-069-C00
(4)
Attach the forward lever hoists to the forward cradle mounts.
S 494-070-C00
(5)
Attach the pulleys to the aft end of the cradle (Fig. 414).
S 494-071-C00
(6)
At the aft bootstrap location attach the cable to the dynanometer.
S 494-072-C00
(7)
Put the cable through the cradle pulleys and attach it to the lever hoist.
S 094-116-C00
(8)
Remove the hardware that attaches the cradle to the transportation base.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C08B Page 480B ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
Power Plant Installation - Bootstrap Method
___________________________________________ Install the Power Plant
S 494-117-C00
CAUTION:_______ WHEN YOU RAISE THE ENGINE, DO NOT APPLY MORE THAN 4000 POUNDS
(1820 KG) ON THE FORWARD OUTBOARD AND FORWARD INBOARD
DYNAMOMETERS, AND 1000 POUNDS (454 KG) ON THE AFT DYNAMOMETER.
DAMAGE TO EQUIPMENT CAN OCCUR.
MAKE SURE THAT THE PRSOV DOES NOT HIT THE PRECOOLER DUCT WHEN
YOU RAISE THE ENGINE. DAMAGE TO THE PRECOOLER AND THE PRSOV
CAN OCCUR IF THE PRSOV HITS THE PRECOOLER.
MAKE SURE THAT THE CTAI DUCT CLAMP DOES NOT DAMAGE THE FORWARD
FIRE SEAL ASSEMBLY ON ENGINE INSTALLATION
MAKE SURE THAT THE POWER FEEDER CONNECTOR (D410) DOES NOT
DAMAGE THE INLET COWL (IF INSTALLED) ON ENGINE INSTALLATION
(9) Raise the engine until it is approximately 6 inches (15 cm) below the strut and engine interfaces (Fig. 422).
(a)
Make sure the PRSOV does not hit the precooler.
(b)
Install new E-seals (2) in the bleed air duct and the precooler flanges (Fig. 405).
(c)
Make sure the starter duct does not hit the strut duct flange.
1) Install the metal seal (2) into the strut duct flange (Fig. 409).
(d)
Temporarily tie the power feeder connector (D410) and wire (Fig. 409) to the starter duct so that the connector does not stay on the inlet cowl (if installed). 1) If the inlet cowl is installed, the D410 connector can
cause damage to the inlet cowl when the engine is raised to the strut.
S 944-118-C00
(10) Make sure all engine connections do not interfere with the strut as you raise the engine.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C13B Page 480C ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
SEE A
AFT ENGINE MOUNT
CONE BOLT
THREAD PROTECTOR (INSTALLED)
6.0 INCHES (15 cm)
AFT ENGINE MOUNT ENGINEFIRE SEALS
FWD
A
Engine Installation - Aft Engine Mount Installation
Figure 422
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C10B Page 480D ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
H56663
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
Power Plant Installation - Bootstrap Method
___________________________________________ Install the Power Plant
S 424-119-C00
(11) Adjust the engine pitch until the forward and aft cone bolts go in their alignment holes at the same time.
NOTE: On some power plant installations, it may be difficult to
____ align the forward cone bolts with the alignment holes on the engine mounts. When this occurs, manually push the engine until you get a better alignment, then keep this position until the engine is attached to the strut.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 动力装置 POWER PLANT 1(134)