EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C01B Page 401 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
G. The procedure to remove the engine can be divided into steps. If you have four persons to remove the engine, use the table below to help you remove the engine more quickly.
~............................................................................. | Step____ Recommended Description |
| | ___________ | | ______________|
No. of Persons | ............................................................................... | 1 | 4 | Do this task: Prepare the Airplane for the | | | | Removal of the Power Plant | ...............................................................................
| 2 | 1 | Open the right thrust reverser, |
| | | Do the core area disconnects on the right side |
| | | |
| | 1 | Open the right thrust reverser (2nd person) |
| | | Open the left thrust reverser, |
| | | Do the core area disconnects on the left side |
| | | |
| | 1 | Do the fan case disconnects on the left side, |
| | | Prepare the GSE equipment for the |
| | | removal of the power plant |
| | | |
| | 1 | Do the fan case disconnects on the right side, |
| | | Prepare the GSE equipment for the |
| | | removal of the power plant |
...............................................................................
| 3 | 4 | Remove the Power Plant with Bootstrap Method |
2........…...................…................................................1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C02B Page 402 ú Nov 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
H. The procedure to install the engine can also be divided into steps. If you have four persons to install the engine, use the table below to help you install the engine more quickly.
~............................................................................. | Step____ Recommended Description |
| | ___________ | | ______________|
No. of Persons | ............................................................................... | 1 | 4 | Remove the Power Plant with Bootstrap Method | ............................................................................... | 2 | 4 | Do this task: Prepare For the Installation | | | | of the Power Plant | ...............................................................................
| 3 | 1 | Do the core area connections on the left side, |
| | | Close the left thrust reverser |
| | | |
| | 1 | Do the core area connections on the right side,|
| | | Close the right thrust reverser |
| | | |
| | 1 | Do the fan case connections on the left side |
| | | |
| | 1 | Do the fan case connections on the right side |
............................................................................... | 4 | 4 | Do this task: Put the Airplane Back To Its | | | | Usual Condition | 2........…...................…................................................1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-02
ALL ú ú C02B Page 403 ú Nov 12/01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 动力装置 POWER PLANT 1(107)