• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 B.
Consumable Materials

 (1)  
D00015 Grease - BMS 3-24

 C.
References

 (1)  
AMM 06-09-06/201, Stabilizer and Elevator Access Doors and Panels

 (2)  
AMM 27-31-00/501, Elevator Control System

 (3)  
AIPC 27-31-56, Fig. 1

 D.
Access

 (1)  
Location Zone 334 Horizontal Stabilizer Rear Spar to Trailing Edge 344 Horizontal Stabilizer Rear Spar to Trailing Edge

 (2)  
Access Panel 334HB, 344HB Inboard Elevator Actuator Access Panel 334LB, 344LB Horizontal Stabilizer Trailing Edge Access Panel 335BB, 345BB Leading Edge Hinge Maintenance Access Door 335DB, 345DB Leading Edge Actuator Access Door 335JB, 345JB Leading Edge Hinge Maintenance Access Door 336BB, 346BB Leading Edge Hinge Maintenance Access Door 336DB, 346DB Leading Edge Actuator Access Door 336JB, 346JB Leading Edge Hinge Maintenance Access Door 336MB, 346MB Leading Edge Hinge Maintenance Access Door 336QB, 346QB Leading Edge Hinge Maintenance Access Door


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-19
 ALL  ú ú 01 Page 405 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E. Procedure
 S 424-049
 (1)  
Install the lever assembly:

 (a)  
Make sure the bearings are installed in the lever assembly housing.

 (b)  
Apply a layer of grease on the bearings and the shank of the bolt.

 (c)  
Align the lever assembly with the support fittings.

 (d)  
Install the bolt, the washer and the nut.
 1) Tighten the nut.


 (e)  
Make sure the lever assembly moves freely in the support assembly.


 S 024-050
 (2)  
Install the control rod:

 (a)  
Align the control rod ends with the attachment fittings.

 (b)  
Install the bolts, washers, and nuts at attachment fittings. 1) Tighten the nuts.


 S 424-051
 (3)  
Install the adjustment control rod:

 (a)  
Adjust the control rod to 9.60 inches.

 (b)  
Apply a layer of grease on the shank of the bolts.

 (c)  
Align the control rod with the attachment fittings.

 (d)  
Install the bolts, the washers, and the nuts. 1) Tighten the nuts.


 S 094-033
 (4)  
Remove the rig pins E-1 and E-2.

 F.
Put the Airplane to its Usual Condition


 S 864-035
 (1)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P180, DC Power Distribution Panel
 1) 180H8, ELEV/RUD VLV SYS 1

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-19
 ALL  ú ú 01 Page 406 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (b)  2) 180E7, ELEV/RUD VLV SYS 2 3) 180H23, ELEV/RUD VLV SYS 3 4) 180E22, ELEV/RUD VLV SYS 4P7, Overhead Circuit Breaker Panel 1) 7E7, L STAB TRIM S/O VLV 2) 7E20, R STAB TRIM S/O VLV
 (2)  S 864-036Set all FLT CONTROL HYD POWER TAIL switches on the P461, Pilots' Overhead Maintenance Panel to NORM.
 (3)  S 864-037Set the STAB TRIM 2 and 3 switches on control stand to AUTO.
 (4)  S 414-041Close the access panels (AMM 06-09-06/201).
 (5)  S 834-038Do this task to adjust the inboard and outboard elevator: Control System Adjustment" (AMM 27-31-00/501). "Elevator
 (6)  S 714-045Do this task for slave linkage assembly operational test: "Operational Test - Elevator Control System" (AMM 27-31-00/501).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-19
 ALL  ú ú 01 Page 407 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(99)