• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

1. CONTROL COLUMN 
TORQUE TUBE  A 

RIG
A
PIN E-1 PUSHROD ATTACHMENT
E1B
REGULATOR ARM  A
2. TENSION FWD SEE C REGULATOR
E1A
B
Elevator Forward Control Quadrant Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-05
 ALL  ú ú 01 Page 403 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

3. AFT QUADRANT  FWD
RIG PIN E-2
TENSION REGULATOR INDICATING SCALE
 FWD
C
Elevator Forward Control Quadrant Installation Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-05
 ALL  ú ú 01 Page 404 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

4. UPPER BEARING RETAINER

13. LOWER BEARING
(3 LOCATIONS)
RETAINER
A-A
Elevator Forward Control Quadrant Installation
Figure 401 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-05
 ALL  ú ú 01 Page 405 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 034-010
 (4)  
Disconnect the cables from the forward quadrant (8).

 (a)  
Do not let the cables become loose after you disconnect them.

 (b)  
If it is necessary, tag the cables to make the installation easier.


 S 024-013
 (5)  
Remove the elevator forward quadrant:

 (a)  
Disconnect the pushrod (16) from the crank (9).

 (b)  
Hold the forward quadrant (8).

 (c)  
Remove the capscrews (12) that connect the lower bearing retainer (13) to the jackshaft (7).

 (d)  
Remove the lower bearing retainer (13) and the lower bearing (11).

 (e)  
Remove the bolts (15) that connect the lower bearing housing (10) to the lower support beam (14).

 (f)  
Remove the lower bearing housing (10).

 (g)  
Remove the bolt retainers (20) and the bolts (6).

 (h)  
Move and lift the forward quadrant until it is clear of the structure.

 (i)  
Remove the capscrews (5) that connect the upper bearing retainer (4) to the jackshaft (7).

 (j)  
Remove the upper bearing retainer (4), the upper bearing (18), and the upper bearing housing (19).

 (k)  
If you removed the left forward quadrant, remove the tension regulator holding tool.


 TASK 27-31-05-404-014
 3.  Elevator Forward Quadrant Installation______________________________________
 A. Special Tools and Equipment
 (1)  
2ME65B80926 - Holding Tool, Cable Rigging Rudder and Elevator Tension Regulator

 (2)  
G12001 Rig Pin Kit

 B.
Standard Tools and Equipment

 (1)  
Cable Tensiometer - 0 to 350 - pound range for 1/8-inch diameter cable

 C.
Consumable Materials

 (1)  
D00013 Grease - MIL-G-23827

 (2)  
C00174 Compound, Corrosion Resistant - MIL-C-16173 Grade 2 (preferred).

 (3)  
C00308 Compound, Corrosion Preventive - MIL-C-11796 Class 3 (optional)

 D.
References

 (1)  
06-09-05/201, Body Section 48 Access Doors and Panels

 (2)  
24-22-00/201, Manual Control

 (3)  
29-11-00/201, Main Hydraulic Supply System


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-05
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(51)