(11)
Do an operational test of the inboard elevator PCP (Ref paragraph 5).
TASK 27-31-07-832-035
4. Inboard Elevator Power Control Package Adjustment (Fig. 203)
_________________________________________________
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 03 Page 210 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
RIG PIN INSTALLED)
Outboard Elevator Neutral Figure 203 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 01 Page 211 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
1.78 INCHES MAX
1. BOLT
1.22 INCHES MAX
2. WASHER
6. CHECKNUT 3. NUT
9. INPUT
CONTROL 7. SLEEVE 4. WASHER
ROD
8. CHECKNUT 5. NUT
B
SEE C
BALLSCREW
STOP
A
"B"
SEE B DIMENSION
INPUT BALLNUT
CONTROL STOP
ROD
VALVE
LEVER
FUSELAGE
CONTOUR
INDEX
TAB
INBOARD
ELEVATOR
INBOARD
ELEVATOR
POWER CONTROL OUTBOARD
PACKAGE ELEVATOR C
Inboard Elevator Neutral
Figure 203 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 02 Page 212 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
A. Parts ~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT | FIG | ITEM | ................................................................................ | 203 | 1 | Bolt Assembly | 27-31-55 | 01 | 10 | | | 2 | Washer | | | 15 | | | 3 | Nut | | | 20 | | | 4 | Washer | | | 25 | | | 5 | Nut | | | 30 | | | | | | | | 2......…........…...................................…...........….....…........1
B. References
(1)
AMM 06-09-06/201, Stabilizer and Elevator Access Doors and Panels
(2)
AMM 24-22-00/201, Manual Control
(3)
AMM 27-31-08/201, Outboard Elevator Power Control Package
(4)
AMM 27-41-00/201, Horizontal Stabilizer Trim Control System
(5)
AMM 29-11-00/201, Main Hydraulic Supply System
C.
Access
(1)
Location Zone
335 Elevator Inboard, LH
345 Elevator Inboard, RH
(2)
Access Panel 334HBL Inboard Elevator Actuator Access Panel 344HBR Inboard Elevator Actuator Access Panel
D.
Prepare for Adjustment
(1)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).
S 862-103
(2)
Pressurize the hydraulic systems No. 1 and 2 (Left Elevator), or 3 and 4 (Right Elevator)(AMM 29-11-00/201).
S 862-119
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 04 Page 213 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
S 862-139
(3)
Pressurize No. 1 and 2 auxiliary pitot systems to 4.7 PSIG max (AMM 34-11-00/201).