SLING
SLING CRADLE
HOIST
FISH CABLE
POLE HOIST FWD INBD
B
Inboard Elevator Power Control Package Sling Cradle and Holding Tool Installation Figure 201
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 01 Page 202 ú Jun 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(5)
AIPC 27-31-07, Fig. 3
(6)
AIPC 27-31-08, Fig. 1
(7)
AIPC 27-31-55, Fig. 1
D.
Access
(1)
Location Zone
335 Elevator Inboard, LH
345 Elevator Inboard, RH
(2)
Access Panel
334HBL Inboard Elevator Actuator Access Panel
344HBR Inboard Elevator Actuator Access Panel
E.
Prepare for Removal
NOTE: Missing Power Control Package, rod end and trunnion bearing
____ dust seals are not reasons for removing the control package. Seals should be replaced at convenience on overhaul. The bearings will generate a small amount of dark colored powder which may be observed at the edge of the bearing lines. This powder is the normal product of the self lubricating bearing liner.
S 862-002
(1)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).
S 862-101
(2)
Do this task: "Supply Hydraulic Power" (AMM 29-11-00/201).
S 862-109
(3)
Set the stabilizer to the neutral rig position (AMM 27-41-00/201).
(a)
Make sure the stabilizer trim position indicators on the P8 control stand shows 3.00 units of trim.
(b)
Make sure the B dimension on the stabilizer jackscrew is
7.42 |0.05 inches.
S 862-138
(4)
Do this task to release the pressure for the applicable hydraulic system: "Remove Hydraulic Power" (AMM 29-11-00/201):
(a)
For the left inboard elevator PCP; Do these steps: 1) Release the pressure in the hydraulic system No. 1.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-07
ALL ú ú 02 Page 203 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
2) Move the control column in the two directions to remove all the remaining pressure in the PCP. 3) Release the pressure in the hydraulic system No.2.
(b) For the right inboard elevator PCP; Do these steps: 1) Release the pressure in the hydraulic system No. 4. 2) Move the control column in the two directions to remove all
the remaining pressure in the PCP. 3) Release the pressure in the hydraulic system No. 3.
S 862-003
(5)
Set all FLT CONTROL HYD POWER TAIL switches on the P461 Pilots' Overhead Maintenance Panel to SHUTOFF.
S 862-004
(6)
Set the STAB TRIM 2 and 3 switches on the control stand to CUTOUT.
S 862-005
(7)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P180, DC Power Distribution Panel
1) 180E7, ELEV/RUD VLV SYS 2
2) 180E22, ELEV/RUD VLV SYS 4
3) 180H8, ELEV/RUD VLV SYS 1
4) 180H23, ELEV/RUD VLV SYS 3
(b)
P7, Overhead Circuit Breaker Panel
1) 7E7, L STAB TRIM S/O VLV
2) 7E20, R STAB TRIM S/O VLV
S 862-121
(8)
If it is necessary, remove these access panels (AMM 06-09-06/201):
(a) 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(58)