• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 345 Inboard Elevator, RH


 (2)  
Access Panel
 334HBL Inboard Elevator Actuator Access Panel
 344HBR Inboard Elevator Actuator Access Panel
 335BBL Leading Edge Hinge Maintenance Access Door
 345BBL Leading Edge Hinge Maintenance Access Door
 335JBL Leading Edge Hinge Maintenance Access Door
 345JBR Leading Edge Hinge Maintenance Access Door


 G.
Prepare for the Installation


 S 224-016
 (1)  
Examine the structural attach points for worn parts
 (AMM 27-31-03/601, AMM 27-31-07/601).


 (a)  
Replace the part if it is damaged.


 S 224-017
 (2)  
If a used bolt or bearing is used for the installation, make sure it is not a worn part.

 S 214-018

 (3)
Examine the condition of the seals at the stabilizer trailing edge.

 (a)  
Replace the seal if it is damaged.

 H.
Install the Inboard Elevator


 S 434-020
 (1)  
Use the sling assembly to lift the inboard elevator to the
 horizontal stabilizer.


 S 424-021

 (2)  
Install the inboard elevator:


 NOTE: The elevator nonreaction hinges (Fig. 402) must be installed
____
 in the sequence of 2, 1, 3, and 4.

 (a)  
Apply a thin layer of grease on the reaction hinge bolt (25).

 (b)  
Install the reaction hinge bolt (25), the washer (23), the outer nut (22) and the inner nut (21). 1) Tighten the outer nut (22) to a torque range of 1600-1700


 pound-inches plus run-on torque.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-01
 ALL  ú ú 01 Page 411 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (c) (d) (e) (f)  2) Tighten the inner nut (21) to a torque range of 500-700 pound-inches plus run-on torque.Apply a thin layer of grease on the bushings (7).Install the bushings (7).Install the lockwasher (5), the bolt (4), the washer (10) and the nut (9). 1) Tighten the nut (9) to a torque range of 290-410 pound-inches.If it is necessary, install the large washers (6) to keep a clearance of 0.01-0.06 inch.
 S 094-022
 (3)  Remove the sling assembly: (a) Remove the sling attachment bolts. (b) Install four bolts at the hoist points.
 S 124-023
 (4)  Clean the faying surfaces.
 S 434-024
 (5)  Connect the bonding jumpers (3) to the elevator nonreaction hinges No. 1, 2, 3, and 4. (a) Install the screw (19), the washers (17), (18), and (20), and the nut (16). (b) Tighten the nut (16).
 S 434-025
 (6)  Connect the bonding jumper (26) to the actuator reaction hinge. (a) Install the screw (28), the washers (27), (29), and (30), and the nut (31). (b) Tighten the nut (31).
 S 764-026
 (7)  Use the bonding meter to measure the electrical resistance of the bonding jumper connections. (a) Make sure that the electrical resistance of the bonding jumper connections is not more than 0.010 ohm.
 S 714-027
 (8)  Move the inboard elevator to the full up and then to the full down position. (a) Make sure the elevator moves freely with a sufficient structural clearance.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-01
 ALL  ú ú 01 Page 412 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 864-028
 (9)  
Move the elevator to align the actuator lug with the actuator rod.

 S 434-029

 (10)
 Do these steps to connect the inboard elevator PCP actuator:

 (a)  
Apply a thin layer of grease to the actuator bolt (36).

 (b)  
Install the bushing (35).

 (c)  
Install the actuator bolt (36) with the head outboard.

 (d)  
Install the outer nut (34), the washer (33) and the inner nut (32). 1) Tighten the outer nut (34) to a torque range of 1700-1800


 pound-inches plus run-on torque. 2) Tighten the inner nut (32) to a torque range of 1500-1600 pound-inches plus run-on torque.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(32)