(1)
Location Zone
311 Area Aft of Pressure Bulkhead, LH
312 Area Aft of Pressure Bulkhead, RH
(2)
Access Panel 312A Horizontal Stabilizer Jackscrew Access Door
D.
Procedure
S 424-068
(1)
Install the limit switch assembly (Fig. 401):
(a)
Assemble the switch to the mounting bracket: 1) Install the switch (without the arm) to the mounting
bracket. 2) Install the bracket-switch locknut. 3) Install the lockwire on the locknut. 4) Put the actuator arm on the switch shaft.
CAUTION:_______DO NOT TIGHTEN THE ARM LOCKNUT. IF THE LOCKNUT IS TIGHT AND YOU TURN THE WORM SCREW, YOU CAN CAUSE DAMAGE TO THE LIMIT SWITCH.
5) Install the arm locknut.
NOTE: Do not tighten the arm locknut.
____
6) Loosen the worm lockscrew.
7) With the switch in fully open (free) position, Adjust the adjustment worm screw: a) Use the feeler gage to measure the clearance of the
actuator arm and the bracket tab.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-41-08
ALL ú ú 10 Page 406 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
b) Make sure the clearance of the actuator arm and the bracket tab is 0.015 |0.005 inch
(0.38 |0.13 millimeter).
c) Tighten the lockscrew.
CAUTION: DO NOT ADJUST THE SWITCH POSITION AGAIN AFTER YOU
_______ ADJUST THE WORM SCREW AND INSTALL A LOCKWIRE ON THE WORM LOCKSCREW. IF YOU ADJUST THE SWITCH, YOU WILL PUT IT OUT OF POSITION. THIS CAN CAUSE DAMAGE TO THE LIMIT SWITCH.
8) Install a lockwire on the worm lockscrew.
(b)
Install the switch assembly with the same bracket that was removed: 1) Install the switch assembly. 2) Install four screws, washers and nuts.
(c)
Install the switch assembly with a new mounting bracket: 1) Install the switch assembly. a) Install two screws in the slots of the mounting
bracket.
b) Install the nuts.
NOTE: Do not tighten the nuts.
____
2) Move the switch assembly to a position where the clearance of the cam surface and the switch roller is in the limits shown in Fig. 401. a) Tighten the nuts in the slots of the mounting bracket.
3) Use the pilot holes in the structure to drill the mounting holes in the bracket. a) Install two screws, washers and nuts in the mounting
holes.
b) Tighten the nuts.
S 434-201
(2)
Make a splice of the switch leads to the wire bundle (WDM 27-41-11, WDM 27-41-21).
(3)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).
S 864-012
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-41-08
ALL ú ú 10 Page 407 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 864-013
(4)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a)
P7, Overhead Circuit Breaker Panel
1) 7E6, STAB TRIM L CONT
2) 7E7, STAB TRIM L S/O VALVE
3) 7E8, STAB TRIM L RATE
4) 7C10, FLT CONT ELEC 2L AC
5) 7C11, FLT CONT ELEC 2L DC
6) 7C12, FLT CONT ELEC 1L AC
7) 7C12, FLT CONT ELEC 1L DC
8) 7E19, STAB TRIM R CONT
9) 7E20, STAB TRIM R S/O VALVE
10) 7E21, STAB TRIM R RATE
11) 7C14, FLT CONT ELEC 1R AC
12) 7C15, FLT CONT ELEC 1R DC
13) 7C16, FLT CONT ELEC 2R AC
14) 7C17, FLT CONT ELEC 2R DC
S 864-014
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
_______ SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS, ELEVATORS, FLAPS, SPOILERS, LANDING GEAR, AND THRUST REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(5) Do this task to pressurize the hydraulic systems No. 2 and 3: "Supply Hydraulic Power" (AMM 29-11-00/201).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(188)