747-400 MAINTENANCE MANUAL
SEE B
CAPTAIN'S COLUMN CONTROL CONTROL ROD ATTACHMENT
SEE A
QUADRANT ELEVATOR AFT RIG PIN E-1
TENSION
REGULATOR
ELEVATOR ELEVATOR AFT
FEEL UNIT TORQUE TUBE
A
FWD
RIG
PIN E-2
B
Elevator Slave Linkage Assembly Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-19
ALL ú ú 01 Page 402 ú Oct 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
ASSEMBLIES LEVER CONTROL ROD OUTBOARD ELEVATOR POWER CONTROL PACKAGE ADJUSTMENT
SEE E
SEE D
SEE C
CONTROL RODS
ADJUSTMENT
CONTROL ROD ATTACHED TO
INBOARD ELEVATOR
SEE E D
LEVER
ASSEMBLIES
CHECKNUT
CONTROL RODS OUTBOARD ELEVATOR POWER CONTROL PACKAGE SHEAROUT RIVETS
ATTACHED TO
INBOARD ELEVATOR
C E
Elevator Slave Linkage Assembly Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-19
ALL ú ú 01 Page 403 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(3) S 864-004Use the STAB TRIM ALTN switches to set the stabilizer to the neutral (approximately 3 units of trim).
(4) S 864-005Set all FLT CONTROL HYD POWER TAIL switches on the P461 Pilots' Overhead Maintenance Panel to SHUTOFF.
(5) S 864-006Set STAB TRIM 2 and 3 switches on control stand to CUTOUT.
(6) S 864-007Open these circuit breakers and attach DO-NOT-CLOSE tags: (a) P180, DC Power Distribution Panel 1) 180H8, ELEV/RUD VLV SYS 1 2) 180E7, ELEV/RUD VLV SYS 2 3) 180H23, ELEV/RUD VLV SYS 3 4) 180E22, ELEV/RUD VLV SYS 4 (b) P7, Overhead Circuit Breaker Panel 1) 7E7, L STAB TRIM S/O VLV 2) 7E20, R STAB TRIM S/O VLV
(7) S 864-008Do this task: "Remove Hydraulic Power" (AMM 29-11-00/201).
(8) S 864-009Do this task: "Remove Electrical Power" (AMM 24-22-00/201).
(9) S 014-010Open the access panels (AMM 06-09-07/201).
S 494-011
(10)
Install the rig pin E-1 in the elevator forward quadrant. S 494-044
(11)
Install the rig pin E-2 in the elevator aft torque tube.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-19
ALL ú ú 01 Page 404 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 024-046
(12)
Remove the control rod:
(a)
Remove the bolts, washers, and nuts that connect the control rod ends to the lever assemblies.
(b)
Remove the control rod.
S 024-047
(13)
Remove the lever assembly:
(a)
Disconnect the control rods from the lever assemblies.
(b)
Remove the bolt, washer, and nut from the lever assembly.
(c)
Remove the lever assembly from the support housing.
S 024-048
(14)
Remove the adjustment control rod:
(a)
Remove the bolts, washers, and nuts from the two ends of the adjustment control rod.
(b)
Remove the adjustment control rod.
TASK 27-31-19-404-019
3. Inboard to Outboard Slave Linkage Assembly Installation_______________________________________________________
A. Special Tools and Equipment
(1)
G12001-50 Rig Pin Kit
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(98)