(2)
AMM 24-22-00/201, Manual Control
(3)
AMM 29-11-00/201, Main Hydraulic Supply System
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-41-04
ALL ú ú 01 Page 220 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
D. Access
(1) Location Zone
311 Area Aft of Pressure Bulkhead, LH
312 Area Aft of Pressure Bulkhead, RH
(2) Access Panel
312A Horizontal Stabilizer Jackscrew Access Door
E. Procedure
S 932-082
(1) FOR THE NEW ELECTRIC MOTOR (16); Install the identification plate (17) that you kept during the removal of the electric motor.
S 862-083
(2) Make sure the manual override lever is at position 2.
S 422-084
(3) Install the electric motor (16) on the shutoff valve (18):
(a) Put the electric motor (16) on the shutoff valve (18).
(b) Engage the output shaft slot of the electric motor with the cam input shaft of the shutoff valve.
(c) Install the screws (19): 1) Apply the corrosion preventive compound to the threads of the screws (19). 2) Tighten the screws (19). 3) Install a lockwire on the screws (19).
S 862-085
(4) Move the manual override lever to position 1.
S 432-086
(5) Connect the electrical connector DB188C or DB189C on the shutoff valve (18).
S 862-080
(6) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a) P7, Overhead Circuit Breaker Panel
1) 7E6, STAB TRIM L CONT
2) 7E7, STAB TRIM L S/O VLV
3) 7E19, STAB TRIM R CONT
4) 7E20, STAB TRIM R S/O VLV
S 862-081
(7) Remove the DO-NOT-MOVE tags and set the STAB TRIM 2 and 3 switches to ON.
S 712-079
(8) Do this task: "Operational Test - Motor Operated Shutoff Valve" (Ref paragraph 11).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-41-04
ALL ú ú 01 Page 221 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
TASK 27-41-04-002-125
14. Filter Screen Removal (Fig. 201)_____________________
A. References
(1)
AMM 06-09-05/201, Body Section 48 Access Doors and Panels
(2)
AMM 24-22-00/201, Manual Control
(3)
AMM 29-11-00/201, Main Hydraulic Supply System
B.
Access
(1)
Location Zone
311 Area Aft of Pressure Bulkhead, LH
312 Area Aft of Pressure Bulkhead, RH
(2)
Access Panel 312A Horizontal Stabilizer Jackscrew Access Door
C.
Procedure
S 862-123
(1)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).
S 862-124
(2)
Set the STAB TRIM 2 and 3 switches to CUTOUT.
S 872-131
(3)
Decrease the remaining pressure in the hydraulic system:
(a)
Move the STAB TRIM ALTN switches to APL NOSE UP and APL NOSE DN three times.
(b)
Attach the DO-NOT-MOVE tags to the STAB TRIM ALTN switches on the control stand.
S 862-161
(4)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P7, Overhead Circuit Breaker Panel
1) 7E6, STAB TRIM L CONT
2) 7E7, STAB TRIM L S/O VLV
3) 7E19, STAB TRIM R CONT
4) 7E20, STAB TRIM R S/O VLV
S 862-121
(5)
If the electrical power is not necessary, do this task: "Remove Electrical Power" (AMM 24-22-00/201).
(6)
Open the access door 312A (AMM 06-09-05/201).
S 012-122
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(167)