• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

OHME65B80713-4, Jack Assembly (2 locations)

 (b)  
OHME65B80713-5, and -6, Base Assembly

 (c)  
OHME65B80713-8, and -9, Support Bracket

 (d)  
OHME65B80713-11, Spreader Bar

 (2)  
ME65B80713-1 Horizontal Stabilizer Actuator Ball Nut Lock (which is referred to as the lock tool)

 (3)  
G27030-1 Torque Adapter

 B.  
Standard Tools and Equipment

 (1)  
Dial Indicator (4 required)

 C.  
References

 (1)  
AMM 24-22-00/201, Manual Control


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-41-06
 ALL  ú ú 01 Page 601 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (2)  
AMM 27-41-00/201, Horizontal Stabilizer Trim Control System

 (3)  
AMM 27-41-06/401, Stabilizer Trim Drive Mechanism

 (4)  
AMM 28-26-00/201, Defueling

 (5)  
AMM 29-11-00/201, Main Hydraulic Supply System

 D.
Access

 (1)  
Location Zone
 311 Area Aft of Pressure Bulkhead, LH
 312 Area Aft of Pressure Bulkhead, RH


 (2)  
Access Panel
 312A Horizontal Stabilizer Jackscrew Access Door


 E.
Prepare for The Test


 S 866-027
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE
_______ STABILIZER AND ELEVATOR SURFACES BEFORE YOU MOVE THE STABILIZER. THE STABILIZERS AND THE ELEVATORS CAN MOVE QUICKLY AND CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (1)
Set the stabilizer at neutral rig position (AMM 27-41-00/201).

 S 866-041

 (2)  
Defuel the horizontal stabilizer fuel tank (Airplanes with a horizontal stabilizer fuel tank) (AMM 28-26-00/201).

 S 866-028

 (3)  
Do this task to depressurize the hydraulic system No. 2 and No. 3: "Remove Hydraulic Power" (AMM 29-11-00/201).

 S 866-029

 (4)  
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).

 S 866-030

 (5)  
Set the STAB TRIM 2 and 3 switches to CUTOUT.

 S 866-031

 (6)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P7, Overhead Circuit Breaker Panel
 1) 7E7, L STAB TRIM S/O VLV
 2) 7E20, R STAB TRIM S/O VLV

 

 S 866-032
 (7)  
If the electrical power is not necessary, do this task: "Remove Electrical Power" (AMM 24-22-00/201).

 (8)  
Open the access door 312A (AMM 06-09-05/201).


 S 016-033
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-41-06
 ALL  ú ú 01 Page 602 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 016-047
 (9)  
Remove the spray shields from the center section of the horizontal stabilizer.

 F.  
Procedure


 S 226-001
 (1)  
Measure the gimbal bushing wear (Index No. 1-4 on Fig. 601):

 (a)  
Install the stabilizer handling equipment (Fig. 602): 1) Loosely attach the support brackets of the spreader bar to the stiffeners with bolts.


 2)  If the spreader bar and support brackets cannot be installed due to the interference with air instrument tubing, do these steps: a) Loosen the fittings for the pitot and static lines. b) Loosen the pitot and static line clamps mounted on the
 bulkhead stiffener. c) Disconnect and cap the pitot and static lines outboard of the actuator assembly. d) Move the pitot and static lines outboard of the spreader bar and support brackets. 3) Loosely attach the spreader bar to the support brackets with the bolts. 4) Tighten the bolts of the support bracket and the spreader bar equally. 5) Attach the left and the right jack assemblies to the spreader bar with the ball ball lockpins. 6) Do the following to install the base assemblies: a) Move the clamping arms of the base assembly to the open position. b) With the handles pointed to the up position, install one assembly on each stabilizer actuator fitting.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(179)