737-300/400/500MAINTENANCE MANUAL
 D. Remove the Shutoff Valve
 S 032-004
 (1)
Disconnect the electrical connector from the valve motor.

 S 022-005

 (2)  
Remove the four bolts that attach the shutoff valve to the modular package.


 S 492-006
 CAUTION:_______DO NOT LET HYDRAULIC FLUID GET ON EQUIPMENT. IF HYDRAULIC FLUID GETS ON EQUIPMENT, IMMEDIATELY CLEAN IT FROM THE EQUIPMENT. HYDRAULIC FLUID CAN CAUSE DAMAGE TO EQUIPMENT.
 (3)  
Put a container below the shutoff valve to catch the hydraulic fluid.

 S 022-007

 (4)  
Carefully turn and pull directly up on the shutoff valve to remove it from the modular package.

 S 032-008

 (5)  
Put a cover on the modular package to keep dirt out.


 TASK 27-81-91-402-009
 3.  Leading Edge Standby Drive Shutoff Valve Installation (Fig. 201)_____________________________________________________
 A. Consumable Materials
 (1)  
D00196 Fluid - Hydraulic, BMS 3-11

 (2)  
D00567 Lubricant - Skydrol Assembly Lube

 B.
References

 (1)  
12-12-00/301, Hydraulic Reservoir

 C.
Access

 (1)  
Location Zone
 216 Main Wheel Well, LH

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-81-91
 ALL  ú ú 01 Page 203 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 D. Procedure
 S 432-010
 (1)
Install the five O-rings with the backup rings on the shutoff valve.

 S 642-011

 (2)  
Lightly lubricate the O-rings and the backup rings with hydraulic fluid or assembly lube.

 S 422-012

 (3)  
Carefully put the shutoff valve in the modular package.

 S 432-013

 (4)  
Install the four bolts that attach the shutoff valve to the modular package.

 S 862-014

 (5)  
Tighten the bolts to 30-40 pound-inches.

 S 432-015

 (6)  
Install lockwire on the four bolts.

 S 432-016

 (7)  
Connect the electrical connector to the valve motor.

 S 862-044

 (8)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P6-2 Circuit Breaker Panel
 1) FLAP SHUTOFF VALVES


 (9)  
Do a test of the shutoff valve.

 (10)
 Fill the hydraulic reservoir if it is necessary (Ref 12-12-00/301).


 S 712-017
 S 612-018
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-81-91
 ALL  ú ú 01 Page 204 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 27-81-91-002-019
 4.  Standby Drive Shutoff Valve Motor Removal (Fig. 201)_________________________________________
 A. Access
 (1)  
Location Zone
 216 Main Wheel Well, LH


 B.
Procedure


 S 862-020
 (1)
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6-2 Circuit Breaker Panel
 1) FLAP SHUTOFF VALVES

 

 S 032-021
 (2)
Disconnect the electrical connector from the valve motor.

 S 862-047

 (3)  
Put the flap shutoff valve lever to position 2.

 S 432-022

 (4)  
Remove the four screws that attach the valve motor to the shutoff valve.

 S 022-023

 (5)  
Remove the valve motor from the shutoff valve.


 TASK 27-81-91-402-048
 5.  Standby Drive Shutoff Valve Motor Installation (Fig. 201)______________________________________________
 A. Access
 (1)  
Location Zone
 216 Main Wheel Well, LH


 B.
Procedure

 (1)  
 