 A. Special Tools and Equipment
 (1)  Rig Pins (F-5 and F-6) - 0.248 +0.000/-0.002 inch diameter, 3.7 |0.25-inches long (MS20392-3)
 NOTE: The Rig pins are a part of the kit F70207-69, -78, or -83.
____
 B. Standard Tools and Equipment
 (1)  
Protective cover for the aftflap support

 (2)  
Support to hold the aftflap (with the protective cover)

 C.
References

 (1)  
AMM 27-51-00/201, Trailing Edge Flap Systems

 (2)  
AMM 27-51-32/401, Inboard Flap Track Fairings

 D.
Access

 (1)  
Location Zone 309, 409 Wing Trailing Edge Flap and Spoilers

 E.
Procedure


 S 014-002
 (1)  
Do this task: Inboard Flap Track Fairing Removal
 (AMM 27-51-32/401).


 S 864-003

 (2)  
Do this task: Hydraulic System B Pressurization (AMM 27-51-00/201).

 S 864-004

 (3)
Put the flap control lever in the UP detent to retract the flaps.

 S 094-005

 (4)  
Install the rig pins F-5 and F-6 in the boom to hold the boom roller between the pins.

 S 864-006

 (5)  
Do this task: Hydraulic System B Depressurization
 (AMM 27-51-00/201).


 S 494-007

 (6)  
Install the support equipment:

 (a)  
Install the protective cover on the aftflap support.

 (b)  
Put the support below the aftflap to make sure it does not move when you disconnect the boom.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-19
 ALL  ú ú 01 Page 401 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

SEE  G 
SEE  A 
SEE  B 
SEE  C 
INBD 
FWD 

BC-4 

SEE  F 
BC-3  BOOM CABLES 
BOOM 
SEE  E  INBD 
BC-3  FWD 
SEE  D  B 
BOLT 
Aftflap Actuating Mechanism Boom Installation Figure 401 (Sheet 1) 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-19
 ALL  ú ú 01 Page 402 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
BOOM
BC-3 CABLES

CABLE WASHER SOCKET

BC-4 

ADJUSTMENT
AND F-6
NUT


Aftflap Actuating Mechanism Boom Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-19
 ALL  ú ú 01 Page 403 ú Jul 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL 
BC-1(A)  BC-2(A)  SEE  H  BC-3 
BC-4 
BC-1(B)  BC-2(B)  MIDFLAP 
GATE EXHAUST  G NUT WASHER (2 LOCATIONS) NUT (2 LOCATIONS) (2 LOCATIONS) BOLT PIN WASHER PLAN VIEW  FWD (2 LOCATIONS) PIN  INBD MECHANISM ACTUATING AFTFLAP 
BOLT  FWD  INBD

Figure 401 (Sheet 3) Aftflap Actuating Mechanism Boom Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-19
 ALL  ú ú 01 Page 404 ú Mar 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (c)  Install the cable clamps on the boom cables where the cables go through the midflap end rib.
 S 024-008
 (7)  
 