27-51-74
ALL ú ú 01 Page 513 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
FLAP CONTROL QUADRANT - REMOVAL/INSTALLATION
____________________________________________
1. General
_______
A. There are two tasks in this procedure. There is a task for the removal and a task for the installation of the flap control quadrant.
TASK 27-51-77-004-001
2. Flap Control Quadrant Removal
_____________________________
A. References
(1)
25-27-15/401, Carpets
(2)
25-52-65/401, Cargo Compartment Ceiling Lining
(3)
27-51-74/401, Flap Control Unit
(4)
53-21-00/401, Passenger Cabin Floor
B.
Access
(1)
Location Zone
202 Lower Nose Compartment
218 Aft Cargo Compartment
(2)
Access Panels
1103L Forward Access Door
C.
Prepare for the Removal
S 014-002
(1)
Get access to the flap control quadrant through the passenger cabin floor or through the aft cargo compartment:
(a)
Get access to the control quadrant through the passenger cabin floor: 1) Do this task to remove the carpet over the floor panel:
"Carpet Removal" (Ref 25-27-15/401).
NOTE: The floor panel is 60 inches long and starts
____ 14 inches forward of the flap control quadrant.
2) Do this task to remove the floor panel above the quadrant: "Passenger Cabin Floor Panel Removal" (Ref 53-21-00/401).
(b) Get access to the control quadrant through the aft cargo compartment: 1) Do this task to remove the forward right ceiling panel in
the aft cargo compartment: "Cargo Compartment Ceiling Lining Removal" (Ref 25-52-65/401).
S 864-003
(2)
Do this task: "Hydraulic System B Pressurization"
(Ref 27-51-00/201).
(3)
Put the flap control lever in the UP detent to retract the flaps.
S 864-028
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-77
ALL ú ú 01 Page 401 ú Jul 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE A
CABLE WFA (LOWER GROOVE) QUADRANT STOPS QUADRANT SEGMENT SHAFT CABLE WFB (UPPER GROOVE)
QUADRANT SUPPORT
SCREWS (8 LOCATIONS)
WHEEL WELL CEILING INBD FWD BOLTS (3 LOCATIONS)
A
Flap Control Quadrant Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-51-77
ALL ú ú 01 Page 402 ú Nov 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 864-004
(4)
Do this task: "Hydraulic System B Depressurization" (Ref 27-51-00/201).
S 034-005
(5)
Do this task: "Flap Control Unit Removal" (Ref 27-51-74/401).
S 014-006
(6)
Open the forward access door 1103L.
D.
Remove the Flap Control Quadrant
S 034-007
(1)
Disconnect the WFA and WFB cables (Fig. 401):
(a)
Remove the turnbuckle lock clips and disconnect the WFA and WFB turnbuckles.
(b)
Install clamps on the cables.
(c)
Install a tag on the cables to identify them.
(d)
AIRPLANES WITH A ONE PIECE WFA/B-2 CABLE; Remove the straps that attach the cable to the quadrant.
(e)
Disconnect the cables from the flap control quadrant.
(f)
Install clamps on the cables.
S 024-008
(2)
Remove the flap control quadrant:
(a)
If the access is through the aft cargo compartment, remove the quadrant segment: 1) Remove the bolt that attaches the quadrant segment to the
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 4(135)