• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:23来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

SEE A FWD
SLEEVE
TRAILING EDGE FLAP CONTROL VALVE
SEE  B 
LEADING EDGE FLAP CONTROL VALVE  CAM  PIN F-1 RIG 
FWD  A 
FWD 
____NOTE:  PAN REMOVED. THE FLAP CONTROL UNIT IS SHOWN WITH THE LOWER  INBD TRAILING CAM LINK EDGE  B  LEADING EDGE LINK 
Trailing Edge Flap Control Valve Repair Figure 801 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-79
 ALL  ú ú 01 Page 802 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (5)  S 358-006Turn the sleeve 90 degrees.
 NOTE:____ This will move the eroded edges of the flap control valve slide with respect to the rectangular slots in the sleeve.
 (6)  S 988-007Put the flap control lever in the 40-unit detent.
 (7)  S 868-008Do this task: "Hydraulic System B Pressurization" (Ref 27-51-00/201).
 (8)  S 868-009Put the flap control lever in the UP detent to retract the flaps.
 (9)  S 718-010Do a test of the trailing edge flap control valve: (a) Extend and retract the flaps five times: 1) Put the flap control lever in the 40-unit detent to extend the flaps. 2) Put the flap control lever in the UP detent to retract the flaps. (b) Stop for two minutes, then do this task: "Hydraulic System B Depressurization" (Ref 27-51-00/201). (c) Remove the lower pan from the flap control unit. (d) Make sure that you can easily install the rig pin F-1 in the flap control unit. (e) If you cannot install the rig pin freely, do this task: "Trailing Edge Flap Control Valve Adjustment" (Ref 27-51-79/501). (f) Install the lower pan on the flap control unit.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-79
 ALL  ú ú 01 Page 803 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TRAILING EDGE FLAP BYPASS VALVE - REMOVAL/INSTALLATION
______________________________________________________
 1.  General_______
 A.  There are six tasks in this procedure. There is a task for the removal and a task for the installation of the bypass valve assembly for the trailing edge flaps. There are tasks for the removal and for the installation of the bypass valve and the valve motor. There is also a task for the removal and a task for the installation of the bypass valve motor. The bypass valve assembly includes the bypass valve, the bypass valve motor and the bypass valve housing.
 TASK 27-51-82-004-001
 2.  Trailing Edge Flap Bypass Valve Assembly Removal________________________________________________
 A.  References
 (1)  
AMM 29-09-00/201, Hydraulic Reservoir Pressurization System

 (2)  
29-15-00/201, Hydraulic Systems A, B and Standby

 B.  
Access

 (1)  
Location Zones
 101, 102 Control Cabin
 217 Right Main Wheel Well


 C.  
Prepare for the Removal


 S 864-002
 (1)  
Do this task to depressurize hydraulic system B: "Depressurize Hydraulic System A, B, or Standby" (Ref 29-15-00/201).

 S 864-003

 (2)  
Do this task to depressurize the hydraulic system B reservoir: "Depressurize Hydraulic Reservoir" (AMM 29-09-00/201).

 S 864-004

 (3)
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6-2 Panel
 1) ALT TE FLAP DRIVE
 2) FLAP (SHUTOFF VALVES)


 D.  
Remove the Bypass Valve Assembly


 S 034-006
 (1)  
Remove the electrical connector from the bypass valve motor (Fig. 401).

 S 034-007

 (2)  
Disconnect the hydraulic lines:

 (a)  
Remove the hydraulic lines from the bypass valve housing.

 (b)  
Install the caps on the hydraulic lines and in the open ports.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 4(144)