• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:23来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 27-51-79-004-001
 2.  Trailing Edge Flap Control Valve Removal________________________________________
 A.  Special Tools and Equipment
 (1)  Rig Pin (F-1) - 0.311 +0.000/-0.002 inch diameter, 3.40 |0.06 inches long (MS20392-4)
 NOTE: The rig pin is a part of the kit F70207-69, -78, or -83.
____
 B.  References
 (1)  
27-51-00/201, Trailing Edge Flap Systems

 C.  
Access

 (1)  
Location Zone
 217 Right Main Wheel Well


 D.  
Procedure


 S 864-002
 (1)  
Retract the trailing edge flaps if it is necessary:

 (a)  
Do this task: "Hydraulic System B Pressurization" (Ref 27-51-00/201).

 (b)  
Put the flap control lever in the UP detent to retract the flaps.

 (c)  
Do this task: "Hydraulic System B Depressurization" (Ref 27-51-00/201).

 (2)
Remove the lower pan from the flap control unit (Fig. 401).

 (3)  
Install the rig pin F-1 through the follower arm and the valve cam.

 S 024-005

 (4)  
Remove the control valve:

 (a)  
Remove the two plug buttons from the control unit housing.


 S 014-003
 S 084-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-79
 ALL  ú ú 01 Page 401 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE A
LEADING EDGE FLAP CONTROL VALVE
FLAP CONTROL VALVE TRAILING EDGE 
SEE  C  MOUNTING BOLT (4 LOCATIONS) 
BELLCRANK BSEE  FWD 
NOTE:____  WITH THE LOWER PAN REMOVED. THE FLAP CONTROL UNIT IS SHOWN  A 
Figure 401 (Sheet 1) Trailing Edge Flap Control Valve Installation 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-79
 ALL  ú ú 01 Page 402 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
TRAILING EDGE FLAP CONTROL VALVE
BOLT
SPACER
BELLCRANK
FWD INBD
B
RIG PIN F-1
CAM
FWD
INBD
C
Trailing Edge Flap Control Valve Installation Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-79
 ALL  ú ú 01 Page 403 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (b)  
Remove the bolt and spacers that attach the control valve to the bellcrank.

 (c)  
Disconnect the hydraulic lines from the control valve: 1) Put a container below the flap control unit to catch the


 hydraulic fluid. 2) Disconnect the hydraulic lines from the control valve. 3) Install the caps on the hydraulic ports and plugs in the
 hydraulic lines.
 (d)  
Disconnect the electrical connector from the solenoid valve.

 (e)  
Remove the four bolts that attach the control valve to the flap control unit.

 (f)  
Carefully remove the control valve from the flap control unit.


 TASK 27-51-79-404-006
 3. Trailing Edge Flap Control Valve Installation
_____________________________________________
 A. Special Tools and Equipment
 (1)  Rig Pin (F-1) - 0.311 +0.000/-0.002 inch diameter, 3.40 |0.06 inches long (MS20392-4)
 NOTE: The rig pin is a part of the kit F70207-69, -78, or -83.
____
 B. Consumable Materials
 (1)  
A00247 Sealant - BMS 5-95, Class B

 (2)  
D00633 Grease - BMS 3-33 (Recommended)

 (3)  
D00013 Grease - MIL-G-23827 (Alternate)

 (4)  
D00196 Hydraulic Fluid - BMS 3-11


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 4(138)