• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 10:19来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 FLAP ACTUATOR - REMOVAL/INSTALLATION
____________________________________
 1.  General_______
 A.  There are two tasks in this procedure. There is a task for the removal and a task for the installation of the flap actuator.
 B.  After you install the flap actuator, you must test the flap actuator.
 TASK 27-51-37-004-001
 2.  Flap Actuator Removal_____________________
 A.  References
 (1)  
AMM 29-11-00/201, Main Hydraulic Supply System

 (2)  
AMM 32-00-30/201, Landing Gear Door Locks

 B.  
Access

 (1)  
Location Zone
 137 Body Landing Gear Well, LH


 C.  
Prepare for the Removal


 S 864-002
 (1)  Do this task to pressurize hydraulic systems No. 1 and 4: "Hydraulic System Pressurization" (AMM 29-11-00/201)
 S 864-012
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE LE AND TE
_______ FLAPS AND FLAP DRIVE MECHANISMS BEFORE YOU MOVE THE FLAP CONTROL LEVER. WITH HYDRAULIC POWER REMOVED, THE FLAPS WILL MOVE AUTOMATICALLY BY ELECTRICAL POWER WHEN YOU MOVE THE FLAP CONTROL LEVER.
 (2)  
Put the flap control lever in the UP detent to retract the trailing edge flaps.

 S 864-004

 (3)
Do this task to depressurize hydraulic systems No. 1 and 4: "Hydraulic System Depressurization" (AMM 29-11-00/201).

 (4)  
Make sure the landing gear ground locks are installed.


 S 864-005
 S 494-006
 WARNING: YOU MUST CAREFULLY DO THE STEPS IN THE TASK BELOW TO INSTALL
_______ THE DOOR LOCKS ON THE LANDING GEAR DOORS. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT INSTALL THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (5)  Do this task: "Installation of the Door Locks on the Body Landing Gear" (AMM 32-00-30/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-37
 ALL  ú ú 01 Page 401 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 864-013
 (6)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6, Main Power Distribution Panel
 1) 6E1, PRI TE FLAP CONT AC
 2) 6E2, PRI TE FLAP CONT DC


 D.
Remove the Flap Actuator


 S 034-009
 (1)  
Disconnect the electrical connector (Fig. 401).

 S 024-010

 (2)  
Remove the flap actuator:

 (a)  
Remove the bolts, washers and nuts that attach the actuator to the input lever and to the housing.

 (b)  
Remove the actuator from the housing.


 TASK 27-51-37-404-011
 3. Flap Actuator Installation
__________________________
 A. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 29-11-00/201, Main Hydraulic Supply System

 (3)  
AMM 32-00-30/201, Landing Gear Door Locks

 B.
Access

 (1)  
Location Zone
 137 Body Landing Gear Well, LH


 C.
Procedure


 S 424-014
 (1)  
Install the flap actuator (Fig. 401):

 (a)  
Put the actuator into the housing.

 (b)  
Attach the actuator to the housing and the input lever with the bolts, washers and nuts.


 S 434-013
 (2)  
Connect the electrical connector.

 D.
Do the Flap Actuator Test

 (1)
Do this task: "Supply Electrical Power" (AMM 24-22-00/201).

 S 864-015

 (2)  
Do this task to pressurize hydraulic systems No. 1 and 4: "Hydraulic System Pressurization" (AMM 29-11-00/201)


 S 864-014
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-51-37
 ALL  ú ú 01 Page 402 ú Jun 18/01
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 5(80)