• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 11:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 

 (4)  
Do the procedure to put the airplane back to its usual condition.


 S 846-022-C00
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-00
 ALL  ú ú C01 Page 615 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
SPLITTER FAIRING INSPECTION
___________________________
 TASK 72-33-00-216-023-C00
 7. Splitter Fairing Inspection
___________________________
 A. References
 (1)  AMM 72-33-04/401, Splitter Fairing
 B. Access
 (1)  Location Zones
 506 No. 1 Engine
 606 No. 2 Engine

 C. Make an Inspection of the Splitter Fairing (Fig. 601)
 S 846-024-C00
 (1)  
If not already done, do the procedure to prepare for the inspection.

 S 216-025-C00

 (2)  
Examine the splitter fairing through the fan rotor blades for the damage that follows:

 (a)  
Cracks on the splitter fairing is not serviceable. 1) Replace the splitter fairing (AMM 72-33-04/401). 2) A maximum service extension of 10 cycles or 25 hours is

 permitted if you find cracks.

 (b)  
There is no maximum quantity of damage to the protective layer.

 


 S 846-026-C00
 (3) Do the procedure to put the airplane back to its usual condition.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-00
 ALL  ú ú C01 Page 616 ú Mar 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
OUTLET GUIDE VANES (OGV) INSPECTION
___________________________________
 TASK 72-33-00-216-027-C00
 8.  Outlet Guide Vanes (OGV) Inspection
___________________________________
 A.  References
 (1)  AMM 72-33-01/401, Outlet Guide Vanes
 B.  Access
 (1)  Location Zones
 506 No. 1 Engine
 606 No. 2 Engine

 C.  Make an Inspection of the OGV's (Fig. 601)
 S 846-028-C00
 (1)  
If not already done, do the procedure to prepare for the inspection.

 S 216-029-C00

 (2)  
ENGINES WITH METALLIC OGV's;
 Examine the OGV's for damage as follows:

 

 NOTE: If the damage is more than the limits, you must replace the
____
 OGV's (AMM 72-33-01/401).

 (a)  
A missing or broken OGV is not serviceable.

 1)  A service extension of a maximum of 10 cycles or 25 hours is permitted with a maximum of two missing or broken OGV's in only the following areas of the fan: a) 1 to 5 o'clock. b) 7 to 11 o'clock.

 (b)  
Cracks are not serviceable.

 (c)  
There is no maximum limit of erosion to the protective layer.

 (d)  
Nicks or dents on the leading or the trailing edges: 1) There is no maximum quantity if they are less than


 0.04 inch (1.0 mm) in depth.
 2)  A maximum service extension of 10 cycles or 25 hours is permitted with no limit of nicks or dents to all depths.
 (e) Nicks or dents on the concave and (or) convex surfaces:
 1)  There is no limit to the number of dents or nicks if the damage is smooth and less than half of the vane thickness. a) It is not permitted to see the damage on the opposite
 side of the vane. 2) A maximum service extension of 10 cycles or 25 hours is permitted with no limit of nicks or dents to all depths.
 (f)  There is no maximum limit of local distortion of the leading or the trailing edges if they are less than an axial depth of
 0.1 inch (2.5 mm) and a radial length of 1.0 inch (25 mm).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 ENGINE 发动机 2(24)