 D.  The fan OGV assembly (Fig. 1) is made of aluminum alloy. It consists of an OGV aft support fairing (inner shroud) and individual vanes.
 (1)  
The fan OGV aft support fairing rear flange is bolted to the fan frame. Its outer surface contains 80 apertures to allow passage of the vane inner platforms and one port for borescope inspection. The fan splitter fairing is attached to the forward end of the inner shroud.

 (2)  
The fan OGV assembly has 80 individual vanes. The vane inner platforms are axially retained by the inner face of the fan (OGV) aft support fairing. The vane outer platforms are bolted to the fan case.

 (3)  
ENGINES WITH CFMI SB 72-743; Composite OGVs have been introduced with a metallic leading edge.

 (4)  
ENGINES WITH CFMI SB 72-796; Lightened aluminum OGVs have been introduced. Use of composite OGVs and aluminum OGVs together is not limited.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-00
 ALL  ú ú C01 Page 4 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
FAN FRAME - INSPECTION/CHECK
____________________________
 1.  General
_______
 A.  The first procedure gives the equipment and steps that are necessary for the borescope inspection.
 B.  This procedure contains eight tasks for visual inspection procedures and maximum service limits and extensions for these engine areas:
 (1)  
Inspection of the Fan Frame

 (2)  
Inspection of the Fan Inlet Case

 (3)  
Inspection of the Abradable Shroud

 (4)  
Inspection of the Acoustic Panels

 (5)  
Inspection of the Splitter Fairing

 (6)  
Inspection of the Outlet Guide Vanes (OGV)

 (7)  
Inspection of the OGV Inner Shroud

 (8)  
Inspection of the Fan Duct Panels


 C.  The last inspection gives the steps to put the airplane back to its usual condition after the inspections.
 D.  The fan cowl panels must be open to get access to the fan frame.
 (1)  
You must see the thrust reversers to see all fan components which are through the aft fan duct.

 (2)  
Look at the other components through the inlet for access.


 E.  Unless stated differently, you must replace the engine if the limits are exceeded (AMM 71-00-02/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 72-33-00
 ALL  ú ú C01 Page 601 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
PREPARE FOR THE INSPECTION
__________________________
 TASK 72-33-00-846-001-C00
 2. Prepare for the Inspection
__________________________
 A. General
 (1)  This procedure gives the equipment and steps that are necessary to prepare for the inspection.
 B. Equipment
 (1)  Protective mats (two necessary) -Rubber Manufacturer's Association, Grade SC43,
 neoprene sponge, 1 inch thick,
 approximately 3 x 4 feet with warning streamer
 attached

 C. References
 (1)  
AMM 71-11-02/201, Fan Cowl Panels

 (2)  
AMM 78-31-00/201, Thrust Reverser System


 D. Access
 (1)  
Location Zones
 502/602 Left Fan Cowl Panel
 503/603 Right Fan Cowl Panel
 506 No. 1 Engine
 606 No. 2 Engine


 (2)  
Access Panels
 5737L Engine No. 1 - Right Fan Cowl Panel
 5746L Engine No. 1 - Left Fan Cowl Panel
 5837R Engine No. 2 - Right Fan Cowl Panel
 5846R Engine No. 2 - Left Fan Cowl Panel

 

 E. Prepare for the Inspection
 S 046-002-C00
 WARNING: DO THE DEACTIVATION PROCEDURE FOR THE THRUST REVERSER TO
_______ PREVENT THE OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF THE THRUST REVERSER CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 ENGINE 发动机 2(18)