• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:17来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 865-111
 (4)  
If the airplane pitches, use the elevator to re-trim the airplane to the same mach number:

 (a)  
Manually turn the stabilizer trim wheel to reduce column force to zero.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 21 Page 575 ú Mar 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (b)  Keep a record of the number of turns required to re-trim the airplane.
 NOTE: During the initial rotation of the trim wheel, there
____ might be some freeplay. Do not count the turns until you remove the freeplay.
 S 865-091
 (5)  
Make sure the number of turns of the stablizer trim wheel are in these limits:

 (a)  
AIRPLANES WITH THE ALUMINUM TAB PUSHRODS; The nose up or nose down turn is not more than one turn.

 (b)  
AIRPLANES WITH THE TITANIUM TAB PUSHRODS; The nose up or nose down turn is not more than two turns.


 S 825-104
 (6)  
If the number of turns of the stabilizer trim wheel is more than the limits, do the steps that follow:

 (a)  
Make sure the rigging of the elevator control pushrods, the input rod of the elevator power control unit and the output rod of the elevator feel and centering unit are correct.

 (b)  
If the rigging are satisfactory, do the task to adjust the elevator tab pushrods after the Elevator Power Off Flight Test.

 (7)  
Install the access panels for the tab rod and the stabilizers.


 S 415-078
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 03 Page 576 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 ELEVATOR - REMOVAL/INSTALLATION
_______________________________
 1.  General_______
 A.  This procedure has two tasks, one for the removal and one for the installation of the elevator. The procedure has these parts:
 (1)  
The removal of the elevator

 (2)  
The installation of the replacement elevator.

 B.  
When it is necessary to balance the elevator, make sure you do a check of the elevator and the elevator tab part numbers. Refer to Chapter 51 of the Structural Repair Manual when you balance the elevator-elevator tab combination after the structural repairs or after you put on new paint.

 C.  
If you install a tab on the elevator during the elevator installation, make sure the number of elevator control tab adjust weights agrees with the tab data plate (Ref 27-31-31/401).


 TASK 27-31-11-004-027
 2.  Elevator Removal________________
 A.  Special Tools and Equipment
 (1)  
C55001-1 - Elevator Sling

 (2)  
Rig Pin (E-5) - 0.309/0311-inch diameter, 6.7 |0.25 inches long (MS20392-4)


 NOTE: The rig pin is part of kit F70207-69, -78 or -83.
____
 (3)  
F80055-1 - Trammel Bar

 B.  
Standard Tools and Equipment

 (1)
Hoist capable of lifting 200 pounds at a height of 20 feet

 C.  
References

 (1)  
27-31-00/201, Elevator and Tab Control System

 (2)  
27-31-00/501, Elevator and Tab Control System- Ajustment/Test

 (3)  
27-09-91/601, Flight Controls Surface - Inspection/Check

 D.  
Access

 (1)  
Location Zone
 711, 712 Elevator and Tab

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-11
 ALL  ú ú 01 Page 401 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (2)  
Access Panels
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(135)