• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:17来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

FWD
RIG PIN E-5
Aft Control Quadrant Rigging Pin Location
Figure 503

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 512 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

CABIN FLOOR
RIG PIN E-1
WEIGHT BLOCKS RIG PIN E-2
FORWARD
CONTROL

1 QUADRANTS RIG FWD PIN E-3
1
RIG PIN E-2 IS LOCATED ON
THE LEFT CONTROL QUADRANT
(OPPOSITE TO THE LOCATION SHOWN).

Forward Control Quadrant and Pitch Transducer Rig Pin Locations Figure 504
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 513 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 2) Loosen the checknut on the pushrod.
 3) Adjust the rod end fitting.

 (e)  
Install the bolt that attaches the elevator pushrod to the output torque tube.

 (f)  
Make sure the right elevator aligns with the index mark in 0.12 inch or less.


 NOTE: One half turn of the rod end fitting is equal to 0.2
____
 inch at the elevator trailing edge.

 (g)  
Make sure the left elevator aligns with the index mark in 0.12 inch or less.

 (h)  
Make sure the distance between the left elevator and the right elevator is not more than 0.12 inch.

 (i)  
If the elevators do not align, adjust the left rod end fittting: 1) Remove the bolt that attaches the elevator pushrod to the


 output torque tube. 2) Loosen the checknut on the pushrod. 3) Adjust the rod end fitting. 4) Make sure the left elevator aligns with the index mark in
 0.12 inch or less.
 (j)  
Make sure the distance between the left elevator and the right elevator is not more than 0.12 inch.

 (k)  
If it is necessary, adjust the right elevator pushrod.

 (l)  
Apply grease to the threads of the checknuts.

 (m)  
Tighten the checknuts on the two end fittings to 750-900 pound-inches.

 (n)  
Install a lockwire.

 (o)  
Install the bolts that attach the elevator pushrods to the output torque tube.


 CAUTION: DO NOT TRY TO TIGHTEN THE FIRST LOCKNUTS AGAIN AFTER YOU
_______ TIGHTEN THE SECOND LOCKNUTS. YOU CAN CAUSE DAMAGE TO THE EQUIPMENT.
 (p)  Install the first locknut. 1) Tighten the first locknut to 500-600 pound-inches.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 514 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
OUTPUT TORQUE TUBE


Elevator Control Pushrod Adjustment
Figure 505

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 02 Page 515 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (q)  
Install the second locknut. 1) Tighten the second locknut to 150-220 pound-inches.

 (r)  
Remove the rigging and restraining tool.

 (s)  
Do this task: "Power Control Unit Installation" (AMM 27-31-14/401) to install the right power control unit.

 (t)  
Adjust the input rod in this task: "Adjustment - Elevator Power Control Unit" (AMM 27-31-14/501).


 S 825-044
 (7)  
Adjust the input rod of the elevator PCU:

 (a)  
Make sure the adjustment of the elevator pushrods is
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(106)