• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:17来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


Procedure
 S 865-049
 (1)  
Do this task: "Remove the pressure from the Elevator Hydraulic Systems A and B" (AMM 27-31-00/201).

 S 865-050

 (2)  
Use the trammel bar to set the B dimension at 41.57 |0.05 inches

 S 865-051

 (3)  
Do this task: "Null Procedure - Mach Trim Actuator" (AMM 27-31-00/201).

 S 735-013

 (4)  
Do a test of the elevator limit travel:


 CAUTION: DO NOT PUT A LOAD OF MORE THAN 65 POUND ON THE ELEVATORS
_______ AT ONE TIME. IF THE LOAD IS TOO HEAVY, IT CAN CAUSE DAMAGE TO THE ELEVATORS.
 (a) Measure the limits of the elevator travel in two directions.
 1)  Use a loading block and apply a force to the elevator rear spar between the inboard rib and the cutout of the elevator tab.
 2) Release the control column and make sure it moves freely. 3) Do this task: Pressurize the Elevator Hydraulic System A or B (AMM 27-31-00/201). 4) Do this task: Remove the Pressure from the Elevator Hydraulic System A and B (AMM 27-31-00/201). 5) Move the left elevator down against the stop. a) Make sure the elevator moves 10.55 +0.60/-0.30 inches from the index mark. 6) Move the left elevator up against the stop. a) Make sure the elevator moves 14.60 +0.30/-0.55 inches from the index mark. 7) Do this task: Pressurize the Elevator Hydraulic System A or B (AMM 27-31-00/201). 8) Do this task: Remove the Pressure from the Elevator Hydraulic System A and B (AMM 27-31-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 02 Page 549 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 9) Move the right elevator down against the stop. a) Make sure the elevator moves 10.55 +0.60/-0.30 inches from the index mark. 10) Move the right elevator up against the stop. a) Make sure the elevator moves 14.60 +0.30/-0.55 inches from the index mark. 11) Do this task: Pressurize the Elevator Hydraulic System A or B (AMM 27-31-00/201). 12) Do this task: Remove Pressure from the Elevator Hydraulic Systems A and B (AMM 27-31-00/201).
 S 865-077
 (5)  Do this task: "Put the Elevator Hydraulic Systems A and B Back to the Condition Before the Pressure Removal" (AMM 27-31-00/201).
 TASK 27-31-00-735-055
 9.  System Test - Elevator Output Torque Tube Bus Linkage_____________________________________________________
 A. Standard Tools and Equipment
 (1)  
Spring Scale - 0-50 pound push-pull scale with the scale graduations of 0.5 pounds or smaller

 (2)  
Loading block (17 inches long, 2 x 4 wood block)

 (3)  
Scale - 0-2 feet

 B.
References

 (1)  
AMM 27-09-91/601, Flight Controls Surface

 (2)  
AMM 27-31-00/201, Elevator and Tab Control System

 C.
Access

 (1)  
Location Zone
 101 Control Cabin, LH
 102 Control Cabin, RH
 711 Elevator and Tab, LH
 712 Elevator and Tab, RH


 D.
Procedure


 S 865-052
 (1)  
Do this task: "Pressurize the Hydraulic Systems A and B" (AMM 27-31-00/201).

 S 865-053

 (2)  
Set the FLT CONTROL A switch to OFF and the FLT CONTROL B switch to ON.

 (3)  
Operate the elevator in the full travel 6 times.

 S 735-054

 (4)  
Do a check of bus linkage in this task: Elevator Output Torque Tube (AMM 27-09-91/601).

 S 865-057

 (5)  
Do this task: "Put the Elevator Hydraulic Systems A and B Back to the Condition Before the Pressurization" (AMM 27-31-00/201).


 S 865-093
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 02 Page 550 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 27-31-00-735-015
 10. System Test - Elevator Tab Linkage
__________________________________
 A. Special Tools and Equipment
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(121)