• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
747-400 MAINTENANCE MANUAL
PUSHRODS FOR THE FIRST OFFICER'S RUDDER PEDALS
HANDLE FOR RUDDER PEDAL ADJUSTMENT
FLEXSHAFT CAPTAIN'SPOSITION RUDDERTRANSDUCER PEDALS
RIGHT SIDE
CLAMP
GROMMETPEDAL ARM
ASSEMBLY
PUSHROD
(EXAMPLE)

RUDDER RB CABLE
FORWARD
QUADRANT

A
RIG PIN R-3 RIGGING
SEE A
PIN R-1
CABIN FLOOR
INTERCOSTAL
RA CABLE
BUS ROD
PUSHROD FOR THE

A
NOSE WHEEL STEERING
LEFT SIDE
SEE B FLEX SHAFT
SUPPORT STRUCTURE
WASHER  SHAFT RETAINING NUT
FWD JACKSHAFT FOR THE RUDDER FORWARD QUADRANT
A
Rudder Forward Quadrant Installation
Figure 401 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-06
 ALL  ú ú 01 Page 402 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.

747-400 
MAINTENANCE MANUAL 
SCREW 
(3 LOCATIONS)  RETAINER 

 

Rudder Forward Quadrant Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-06
 ALL  ú ú 01 Page 403 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 014-006
 (4)  
Open the two forward center ceiling panels in the main deck compartment (in front of the No. 1 door) to get access to the rudder forward quadrants.

 S 014-007

 (5)  
Open the second inboard ceiling panel (panel No. 241CL) aft of the No. 2 door in the main deck compartment for access to the turnbuckles.

 D.
Procedure


 S 844-043
 (1)
Do these steps before you remove the right rudder forward quadrant:

 (a)  
Install a clamp on cables RA and RB (to keep the cables tight) aft of the turnbuckles at ceiling panel No. 241CL.

 (b)  
Loosen the turnbuckles to loosen cables RA and RB. Loosen the cables together to keep the tension the same in each cable.

 (c)  
Disconnect cables RA and RB from the rudder forward quadrant.

 (d)  
Put tags on the cables for identification.


 S 024-012
 (2)  
Do these steps to remove the rudder forward quadrant:

 (a)  
Disconnect the bus rod from the rudder forward quadrant.

 (b)  
Disconnect the pushrods, for the rudder pedals, from the rudder forward quadrant.

 (c)  
For the left rudder forward quadrant, disconnect the pushrod for the nose wheel steering.

 (d)  
For the right rudder forward quadrant, disconnect the pushrod to the position transducer.

 (e)  
Remove the clamps from the flexshaft.

 (f)  
Disconnect the shaft retaining nut from the flexshaft.

 (g)  
Hold the shaft retaining nut and the washer and pull the flexshaft clear of the support structure.

 (h)  
Remove the two bolts that attach the ceiling support clip to the support beam for the lower bearing.

 (i)  
Remove the ceiling support clip from the support tee.


 NOTE: If the ceiling support clip is attached with rivets,
____
 drill the rivets.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-06
 ALL  ú ú 01 Page 404 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (j)  
Remove the two bolts at each end of the support beam for the lower bearing.

 (k)  
Remove the drip shield panel (inboard of the quadrant assembly) to get access to the bolts for the upper bearing housing.

 (l)  
Remove the four bolts that attach the upper bearing housing to the airplane.

 (m)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(89)