• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 D.  
References

 (1)  
06-09-08/201, Wing Access Doors and Panels

 (2)  
24-22-00/201, Manual Control

 (3)  
27-11-00/501, Aileron and Aileron Trim Control System

 (4)  
29-11-00/201, Main Hydraulic Supply System

 (5)  
IPC 27-11-12, Fig. 2

 E.  
Procedure


 S 864-015
 (1)  
Make sure the horizontal reaction link will fit to the power control package at the forward end.

 (a)  
If it does not, make sure the flange bushings are correctly installed.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-17
 ALL  ú ú 01 Page 403 ú Feb 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 214-004
 (2)  
Examine the fittings of the aileron and the horizontal reaction link for corrosion.

 S 424-005

 (3)  
Install the horizontal reaction link (Fig. 401):

 (a)  
Apply a layer of grease on the aft bolt.

 (b)  
Install the antirotation plate on the attach bolt.

 (c)  
Install the retaining ring on the aft bolt.

 (d)  
Install the bushing, washer and bolt (Section A-A).

 (e)  
Measure the run-on torque of the nut with a spanner wrench.

 (f)  
Tighten the aft bolt nut to 2850-3050 pound-inches.


 NOTE: Use the antirotation plate to hold the bolt head when
____
 you tighten the nut.

 (g)  
Apply a thin layer of grease on the forward bolt.

 (h)  
Install the forward bolt and washers (Section B-B).

 (i)  
Install the nuts but do not tighten.

 (j)  
Measure the run-on torque of the nuts with the spanner wrenches.

 (k)  
Tighten the large nut to 40-60 pound-inches more than the run-on torque.

 (l)  
Tighen the small nut to 40-60 pound-inches more than the run-on torque.

 (m)  
Install the middle bolt to attach the horizontal reaction link to the power control package.


 S 094-014
 (4)  
Remove the inboard aileron lock.

 S 714-006

 (5)  
Do a check on the operation of the aileron:

 (a)  
Supply electrical power (Ref 24-22-00/201).

 (b)  
Supply hydraulic power (Ref 29-11-00/201).

 (c)  
Turn the aileron control wheel quickly through full travel each direction from the neutral position. 1) Make sure the ailerons operate correctly.

 (d)  
Turn the control wheel full clockwise.
 1) Make sure the right aileron moves full UP.
 2) Make sure the left aileron moves full DOWN.


 (e)  
Turn the control wheel full counterclockwise.
 1) Make sure the left aileron moves full UP.
 2) Make sure the right aileron moves full DOWN.

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-17
 ALL  ú ú 01 Page 404 ú Feb 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 714-007
 (6)  
Do a "Test of the aileron operation with one hydraulic power source" (AMM 27-11-00/501).

 F.
Put the Airplane Back to Its Usual Condition


 S 864-008
 (1)  
Remove hydraulic power (Ref 29-11-00/201).

 S 864-009

 (2)  
Remove electrical power (Ref 24-22-00/201).

 S 414-010

 (3)  
Install the access panels (06-09-08/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-17
 ALL  ú ú 01 Page 405 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(19)