• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (4)  
Move the rudder fully left, then fully right and make sure the rudder moves smoothly.

 S 864-124

 (5)  
Remove hydraulic power if it is not necessary (Ref 29-11-00/201).

 S 644-125

 (6)  
Lubricate the rudder hinge(s) (Ref 12-21-17/301).


 S 084-126
 WARNING:_______MAKE SURE THE NOSE LANDING GEAR IS POINTED FORWARD. IF THE TIRES ARE NOT PARALLEL WITH THE AIRPLANE, THEY CAN TURN QUICKLY WHEN YOU REMOVE THE RIG PIN. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
 (7)  
Remove the rig pin from the steering metering valve for the nose landing gear (Ref 32-50-00/201).

 (8)  
Install the access panels that you removed (Ref 06-09-07/201).

 (9)  
Remove electrical power if it is not necessary (Ref 24-22-00/201).


 S 414-127
 S 864-128
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-03
 ALL  ú ú 02 Page 419 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 RUDDER PEDAL ADJUSTMENT CRANK - REMOVAL/INSTALLATION
____________________________________________________
 1.  General_______
 A.  This procedure has two tasks. The first task gives you the instructions to remove the adjustment crank for the rudder pedals. The second task gives you the instructions to install the adjustment crank.
 B.  There are two adjustment cranks for the rudder pedals (captain's and first officer's). This procedure is the same for the two adjustment cranks.
 C.  The procedure to remove the adjustment crank has these basic steps:
 (1)  
Remove hydraulic power from the rudder.

 (2)  
Remove the adjustment crank.

 D.
The procedure to install the adjustment crank has these basic steps:

 (1)  
Install the adjustment crank.

 (2)  
Put the hydraulic system back to its usual condition.


 TASK 27-21-05-004-001
 2.  Rudder Pedal Adjustment Crank Removal (Fig. 401)_____________________________________
 A.  References
 (1)  
24-22-00/201, Manual Control

 (2)  
IPC 27-21-04 Fig. 1

 B.  
Access

 (1)  
Location Zone
 221 Control Cabin, LH
 222 Control Cabin, RH
 211 Passenger Cabin-Nose to First Door, LH
 212 Passenger Cabin-Nose to First Door, RH


 C.  
Prepare for the removal.


 S 014-002
 (1)  
Open the forward center ceiling panel in the main deck compartment (ahead of the No. 1 door) for access to the rudder forward quadrant.

 (2)  
Supply electrical power (Ref 24-22-00/201).

 S 864-004

 (3)  
Find the switches for the FLT CONTROL HYD POWER on the Pilot's Overhead Maintenance Panel, P461.

 (a)
Put the TAIL switches in the SHUT OFF position.


 S 864-003
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-05
 ALL  ú ú 01 Page 401 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400 MAINTENANCE MANUAL
SEE B
SEE C
SEE A
SEE D
A
3.
 FLEXSHAFT


4.
 UPPER COVER

2. WASHER
1. NUT
(4 LOCATIONS)

5.
 HANDLE

6.
 NUT

7.
 SCREW


12. SCREW (4 LOCATIONS)(2 LOCATIONS) 8. RETAINING 11. SUPPORT PLATEBRACKET
9.
 BEARING

10.
 SCREW


HOUSING
(4 LOCATIONS)
FWD
B
Rudder Pedal Adjustment Crank Installation Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-05
 ALL  ú ú 01 Page 402 ú Jun 10/91
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(86)