• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (g)  
Tighten the locknut for the rod end.

 (h)  
Connect the pushrod to the pedal arm.

 (i)  
Remove rig pins R-1, R-2, and R-3.


 S 735-130
 (3)  
Do these steps to find if the rudder forward quadrants are adjusted correctly.

 (a)  
Install rig pin R-4 in the feel, centering, and trim mechanism (Fig. 502).

 (b)  
Make sure rig pin R-3 goes freely in the forward quadrant. If it does not, adjust cables RA and RB (Fig. 501).


 S 735-131
 (4)  
Do these steps to make sure the tension in cables RA and RB is correct.

 (a)  
Use a cable tensiometer to make sure the cables have the tension shown in figure 503. 1) If the cable tension is more than 15 pounds different from


 the specified tension in figure 503, adjust the cables RA and RB.
 S 835-034
 (5)  
Do these steps to adjust cables RA and RB (Fig. 501, and 502)

 (a)  
Make sure rig pin R-4 is in the feel, centering, and trim mechanism.

 (b)  
If you installed new cables, RA and RB, then do these steps: 1) Install rig pin R-3 in the forward quadrant. 2) Adjust the two turnbuckles, at the same time, until cables


 RA and RB have a tension of 230-270 pounds. 3) Remove rig pins R-3 and R-4. 4) Move the rudder pedals through 25 cycles. 5) Install rig pin R-4 in the feel, centering, and trim
 mechanism.
 (c)  
Adjust the turnbuckles for cables RA and RB until you get these results: 1) Rig pin R-3 fits freely in the forward quadrant. 2) Cables RA and RB have the tension shown in Figure 503.

 (d)  
Remove rig pins R-3 and R-4.

 (e)  
Move the rudder pedals through one cycle.

 (f)  
Make sure the tension in the cables is correct (Fig. 503).

 (g)  
Apply a thin layer of corrosion preventive compound to the threads of the turnbuckles.

 (h)  
Install the clip locks on all of the turnbuckles.


 S 735-132
 (6)  
Do these steps to make sure the rudder trim is adjusted correctly (Fig. 504).

 (a)  
Install rig pin R-4 in the feel, centering, and trim mechanism.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-00
 ALL  ú ú 09 Page 517 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

RB-3  R RA-4 B-4 
RB-2  RA-3 
RA-2 
RB-3A 
RA-3A 
TURNBUCKLES 

TENSION IN THE CABLE (LBS)

RB-1 RA-1
NOTE:THE TEMPERATURE OF THE AIRPLANE MUST BE |5`F OF THE AMBIENT TEMPERATURE AND MUST BE STABLE FOR AT LEAST 1 HOUR.
180
160
140 120  150 |10 LBS AT 70`F, THE CORRECT CABLE TENSION IS 
100  SPECIFIED TENSION 
80  TOLERANCE |10 LBS 

-40-20 0 20 40 60 80100120
AMBIENT TEMPERATURE (DEGREES F)
RA AND RB CABLE TENSION LOADS

1 THE CABLES MUST BE ADJUSTED IF THE TENSION IN THEMIS MORE THAN |15 POUNDS FROM THE SPECIFIED TENSION. WHEN YOU ADJUST THE CABLES, ADJUST THEM TO |10 POUNDS OF THE SPECIFIED TENSION.
Rudder Cable Adjustment Figure 503
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-21-00
 ALL  ú ú 01 Page 518 ú Oct 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

RUDDER TRIM
RUDDER TRIM  10  5  0  5  10 
INDICATOR 
NOSE LEFT  UNITS  NOSE RIGHT 
AILERON 
NOSE  NOSE 
LEFT  R  RIGHT 
LEFT  RIGHT  U 
WING DOWN  WING DOWN  D D E 

RUDDER TRIM CONTROLS RUDDER TRIM CONTROLS
RUDDER
A
SEE A  TRIM KNOB
FLIGHT COMPARTMENT
TOP
ADJUSTABLE SEE B
STOP
OUTPUT CRANK TO UPPER RUDDER
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(53)