• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:54来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 591EB Outboard Aileron, Lower Wing Surface, LH
 591FB Outboard Aileron, Lower Wing Surface, LH
 591AT Aileron Actuator, Upper Wing Surface, LH
 691AB Outboard Aileron, Lower Wing Surface, RH
 691BB Outboard Aileron, Lower Wing Surface, RH
 691CB Outboard Aileron, Lower Wing Surface, RH
 691DB Aileron Actuator, Lower Wing Surface, RH
 691EB Outboard Aileron, Lower Wing Surface, RH
 691FB Outboard Aileron, Lower Wing Surface, RH
 691AT Aileron Actuator, Upper Wing Surface, RH


 G.
Procedure


 S 422-100
 (1)  
Install the check valve (fig. 201):

 (a)  
Lubricate the backup rings (44, 46, 51, and 53), O-ring packings (45 and 52) and screw threads with assembly lubricant or hydraulic fluid before installation.

 (b)  
Install new backup rings (44, 46, 51, and 53) and O-ring packings (45 and 52) on the check valves (47 and 50).

 (c)  
Install the check valves (47 and 50).


 NOTE: The flow arrow on the check valve must point into the
____ manifold during installation.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-13
 ALL  ú ú 03 Page 223 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (d)  
Install the covers (41 and 48) with the washers (43 and 55) and screws (42 and 54).

 (e)  
Tighten the screws (54) that attach to the dual cover to 50-75 pound-inches.

 (f)  
Install the lockwire.

 (g)  
Tighten the screws (42) that attach to the cover to 60-80 pound-inches.

 (h)  
Install the lockwire.


 S 862-084
 (2)  
For the applicable system, remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P180 DC Power Distribution Panel
 1) 180H7 LATERAL CONT VALV SYS 1
 2) 180E6 LATERAL CONT VALV SYS 2
 3) 180H22 LATERAL CONT VALV SYS 3
 4) 180E21 LATERAL CONT VALV SYS 4

 

 S 862-085
 (3)  
Set the FLT CONTROL HYD POWER - WING VALVE switches No. 1, 2, 3 and 4 on the P461 Pilot's Overhead Maintenance Panel to NORM.

 S 862-087

 (4)  
Do this task: "Hydraulic System Pressurization" (Ref 29-11-00/201).

 S 862-088

 (5)  
Operate the aileron a minimum of two times.

 S 792-097

 (6)  
Examine the cover for leaks.

 H.
Put the Airplane Back to Its Usual Condition


 S 862-089
 (1)  
Do this task: "Hydraulic System Depressurization"
 (Ref 29-11-00/201).


 S 612-090

 (2)  
Do this task: "Service the Hydraulic Reservoirs"
 (Ref 12-12-01/301).


 S 862-091

 (3)  
Do this task if electrical power is not necessary: "Electrical Power Removal"(Ref 24-22-00/201).

 (4)  
Close the access panel on the lower wing surface.


 S 412-092
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-13
 ALL  ú ú 02 Page 224 ú Feb 15/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 092-093
 (5)  Remove the safety device and safety harness installed on the receptacle, on the wing upper surface.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-11-13
 ALL  ú ú 02 Page 225 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 OUTBOARD AILERON LOCKOUT MECHANISM - REMOVAL/INSTALLATION
_________________________________________________________
 1.  General_______
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 2(8)