• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:23来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)  
AIPC 32-21-03 Fig. 1

 D.
Access

 (1)  
Location Zone
 715 Nose Landing Gear

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-21-03
 ALL  ú ú 01 Page 202 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

UPPER TORSION 
LINK 
SEE  A 




LOWER TORSION 
LINK 
FWD 

5.5 
UPPER 
TORSION  CRIMP FERRULE 
CABLE  LINK  (2 PLACES) 
BUTTON 
QUICK-
RELEASE  14.0 
PIN 
APEX 
BOLT  0.12 
2.12 
LOWER  THREADED 
TORSION  BUSHING 
LINK 
HANDLE  ____NOTE:  DIMENSIONS ARE IN INCHES. 
A-A 
B-B 
Torsion Links Connection 
Figure 201 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-21-03
 ALL  ú ú 01 Page 203 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E.  Connect the Nose Gear Torsion Links (Fig. 201)
 S 842-011
 (1)  
Make sure there is no pressure to hydraulic system No. 1
 (AMM 29-11-00/201).


 S 422-008

 (2)  
Install the apex bolt of the torsion link of the nose landing gear (Fig. 201).

 (a)  
Remove the holding tool from the torsion link.

 (b)  
Put the upper torsion link end in the fork of the lower torsion link.


 NOTE: If it is necessary, manually move the upper torsion link
____ to align with the lower torsion link. Push the end of the upper torsion link in the necessary direction to align correctly.
 (c)  
Lubricate the apex bolt shank and threads with grease.

 (d)  
Insert apex bolt and screw into threaded bushing.


 1)  Tighten the bolt with your hand and install the quick-release pin.
 S 092-009
 WARNING:_______REFER TO AMM 32-00-30/201 FOR THE LOCK REMOVAL PROCEDURE. THE DOORS CAN CLOSE QUICKLY IF YOU DO NOT REMOVE THE DOOR LOCKS CORRECTLY. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (3)  Remove the door locks of the nose landing gear (AMM 32-00-30/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-21-03
 ALL  ú ú 01 Page 204 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 NOSE GEAR TORSION LINKS - REMOVAL/INSTALLATION
______________________________________________
 1.  General_______
 A.  This procedure has two tasks:
 (1)
The removal of the torsion links for the nose landing gear.

 (2)
The installation of the torsion links for the nose landing gear.

 B.  
The torsion links are connected together by the tripod apex pin at their forward ends. The aft end of the upper link is connected to the forward steering collar. The aft end of the lower link is connected to the forward side of the inner cylinder for the shock strut.


 TASK 32-21-03-004-001
 2.  Torsion Links Removal (Fig. 401)_____________________
 A.  Special Tools and Equipment
 (1)  
8ME65B01202-1, Torsion Link Holding Tool (referred to as the holding tool in this procedure)

 B.  
References

 (1)  
AMM 07-11-02/201, Jacking Airplane Nose

 (2)  
AMM 09-11-00/201, Towing

 (3)  
AMM 32-00-30/201, Landing Gear Door Locks

 (4)  
AMM 32-45-02/401, Nose Gear Wheel and Tire

 (5)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 3(128)