• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 25-57-11
 ALL  ú ú 07 Page 406 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (3)  S 434-030Install the four washers and bolts (hex head) to attach the actuator to the side of the drive-wheel housing.
 NOTE:____ Tighten the bolts to 126-154 inch-pounds.
 (4)  S 434-031Connect the actuator wire bundle to the relay and terminal block on the side of the drive-wheel housing.
 (5)  S 434-032Attach the axle bolt to the actuator nut.
 NOTE:____ The axle bolt is in the drive-wheel axle. bolt to 126-154 inch-pounds. Tighten the axle
 (6)  S 414-033Install the power drive unit (PDU) in the floor (Ref 25-57-01/401).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-11
 ALL  ú ú 04 Page 407 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 REMOTE CARGO CONTROL PANEL - REMOVAL/INSTALLATION
_________________________________________________
 1.  General
_______
 A.  This procedure has two tasks. The first task gives instructions to remove the remote cargo control panel (M10). The second task gives instructions to install the remote cargo control panel. The control panel attaches to a support bar on the sidewall which is opposite of the side cargo door.
 TASK 25-57-12-004-032
 2.  Remote Cargo Control Panel Removal (Fig. 401)
__________________________________
 A.  Access
 (1)  Location Zone
 210 Main Deck

 B.  Procedure
 S 864-002
 (1)  Open this circuit breaker and attach a DO-NOT-CLOSE tag:
 (a)  P415, Power Distribution Center Right Panel 1) 415F18, CARGO HANDLING CONT MN DK
 S 034-003
 (2)  
Disconnect the electrical connector plug (P1) from the electrical receptacle (DM10).

 S 034-022

 (3)  
Loosen the fasteners at each end of the support bar.


 NOTE: Two fasteners are at the forward end of the support bar and
____
 three fasteners at the aft end.

 S 024-023
 (4)  Remove the support bar with the control panel.
 TASK 25-57-12-404-007
 3.  Remote Cargo Control Panel Installation (Fig. 401)
_______________________________________
 A.  References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 25-57-00/501, Main Deck Cargo Handling System


 B.  Access
 (1)  Location Zone
 210 Main Deck

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-12
 ALL  ú ú 06 Page 401 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

 

REMOTE CARGO CONTROL PANEL (M10)


Remote Cargo Control Panel Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-12
 ALL  ú ú 01 Page 402 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 C. Install the Remote Cargo Control Panel
 S 864-008
 (1)  
Make sure the 415F18, CARGO HANDLING CONT MN DK circuit breaker is open on the P415, Power Distribution Center Right Panel.

 S 424-009

 (2)  
Hold the support bar with the control panel in its position against the sidewall.

 S 434-029

 (3)  
Tighten the fasteners at each end of the support bar to attach it to the sidewall.

 S 434-010

 (4)  
Connect the electrical connector plug (P1) to the electrical receptacle (DM10).

 S 864-011

 (5)  
Remove the DO-NOT-CLOSE tag and close this circuit breaker:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(95)