S 024-125
(4)
Remove the park rail.
Remove the Outboard Guide/Restraint Rails
S 034-061
(1)
Retract the retaining pins in the rail supports:
(a) Push the retaining pin lock on the retaining pin handle.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-58-02
ALL ú ú 03 Page 402 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
F.
G.
H.
A
747-400
MAINTENANCE MANUAL
(b)
Turn the retaining pin handle counterclockwise to the vertical position.
(c)
Pull the retaining pin handle to retract the retaining pin.
S 034-062
(2)
Retract the coupling plungers at the ends of the rail.
S 024-063
(3)
Remove the rail.Remove the Rail Supports
S 014-064
(1)
Remove the guide/restraint rail to get access to the rail support.
S 034-065
(2)
Lift the shear-plunger levers to retract the shear-plunger studs.
NOTE: The shear-plunger levers must stay locked in the up position.
____
S 034-066
(3) Move the rail support approximately 0.50 inch in the forward or aft direction.
NOTE: The tension studs on the bottom of the rail support must
____ align with the holes in the seat track and the floor fitting.
S 024-067
(4)
Remove the rail support.
Remove the Retractable Guide/Restraint Rails (Side Cargo Door)
S 034-068
(1)
Pull the pin-release handles on the rail in the outboard direction to retract the retaining pins from the rail supports.
NOTE: The pin-release handles must stay locked in the outboard
____
position.
S 034-069
(2)
Remove the quick-release lockpin to disconnect the hinge link from the fitting at the end of the rail.
S 024-070
(3)
Remove the rail.
Remove the Retractable Rollout Guide/Stops (Side Cargo Door)
S 014-071
(1)
Remove or retract the guide/restraint rail to get access to the rollout guide/stop.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-58-02
ALL ú ú 04 Page 403 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 034-072
(2) Lift the shear-plunger levers to retract the shear-plunger studs.
NOTE: The shear-plunger levers must stay locked in the up position.
____
S 034-073
(3) Move the rollout guide/stop approximately 0.50 inch in the forward or aft direction.
NOTE: The tension studs on the bottom of the rollout guide/stop
____ must align with the holes in the seat track.
S 024-074
(4) Remove the rollout guide/stop.
I. Remove the Transition Guide Rail (P29th pallet position)
S 034-079
(1)
Remove the quick-release lockpin to disconnect the forward end of the transition guide rail from the guide/restraint rail (STA 2130-2200).
S 034-080
(2)
Remove the spring pin and the pivot pin at the aft end of the transition guide rail.
S 024-081
(3)
Remove the transition guide rail.
J. Remove the Stowage Support for the Transition Guide Rail (P29th pallet position)
S 034-082
(1) Lift the shear-plunger lever to retract the shear-plunger stud.
NOTE: The shear-plunger lever must stay locked in the up position.
____
S 034-083
(2) Move the stowage support approximately 0.50 inch in the forward or aft direction.
NOTE: The tension studs on the bottom of the stowage support must
____
align with the holes in the seat track.
S 024-084
(3) Remove the stowage support.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(119)