• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 024-125

 (4)
Remove the park rail.
Remove the Outboard Guide/Restraint Rails


 S 034-061

 (1)  
Retract the retaining pins in the rail supports:


 (a)  Push the retaining pin lock on the retaining pin handle.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-02
 ALL  ú ú 03 Page 402 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 F.
G.
H.
A
747-400
MAINTENANCE MANUAL

 (b)  
Turn the retaining pin handle counterclockwise to the vertical position.

 (c)  
Pull the retaining pin handle to retract the retaining pin.


 S 034-062
 (2)  
Retract the coupling plungers at the ends of the rail.

 S 024-063

 (3)
Remove the rail.Remove the Rail Supports

 S 014-064

 (1)  
Remove the guide/restraint rail to get access to the rail support.

 S 034-065

 (2)  
Lift the shear-plunger levers to retract the shear-plunger studs.


 NOTE: The shear-plunger levers must stay locked in the up position.
____
 S 034-066
 (3)  Move the rail support approximately 0.50 inch in the forward or aft direction.
 NOTE: The tension studs on the bottom of the rail support must
____ align with the holes in the seat track and the floor fitting.
 S 024-067
 (4)
Remove the rail support.
Remove the Retractable Guide/Restraint Rails (Side Cargo Door)


 S 034-068

 (1)  
Pull the pin-release handles on the rail in the outboard direction to retract the retaining pins from the rail supports.


 NOTE: The pin-release handles must stay locked in the outboard
____
 position.

 S 034-069
 (2)  
Remove the quick-release lockpin to disconnect the hinge link from the fitting at the end of the rail.

 S 024-070

 (3)
Remove the rail.
Remove the Retractable Rollout Guide/Stops (Side Cargo Door)


 S 014-071

 (1)  
Remove or retract the guide/restraint rail to get access to the rollout guide/stop.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-02
 ALL  ú ú 04 Page 403 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 034-072
 (2) Lift the shear-plunger levers to retract the shear-plunger studs.
 NOTE: The shear-plunger levers must stay locked in the up position.
____
 S 034-073
 (3)  Move the rollout guide/stop approximately 0.50 inch in the forward or aft direction.
 NOTE: The tension studs on the bottom of the rollout guide/stop
____ must align with the holes in the seat track.
 S 024-074
 (4)  Remove the rollout guide/stop.
 I.  Remove the Transition Guide Rail (P29th pallet position)
 S 034-079
 (1)  
Remove the quick-release lockpin to disconnect the forward end of the transition guide rail from the guide/restraint rail (STA 2130-2200).

 S 034-080

 (2)  
Remove the spring pin and the pivot pin at the aft end of the transition guide rail.

 S 024-081

 (3)  
Remove the transition guide rail.


 J.  Remove the Stowage Support for the Transition Guide Rail (P29th pallet position)
 S 034-082
 (1) Lift the shear-plunger lever to retract the shear-plunger stud.
 NOTE: The shear-plunger lever must stay locked in the up position.
____
 S 034-083
 (2)  Move the stowage support approximately 0.50 inch in the forward or aft direction.
 NOTE: The tension studs on the bottom of the stowage support must
____
 align with the holes in the seat track.

 S 024-084
 (3)  Remove the stowage support.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(119)