(9)
Remove the DO-NOT-CLOSE tags and close the circuit breakers for the applicable ceiling panel:
(a) On the P415 Power Distribution Center Right Panel
S 864-211
(10)
Supply the electrical power (AMM 24-22-00/201).
S 214-212
(11)
Make sure the ceiling light operates correctly.
S 864-213
(12)
Remove the electrical power if it is not necessary
(AMM 24-22-00/201).
H. Install the Aft Pressure Bulkhead Cargo Lining Panels
S 434-215
(1) If it is applicable, connect the left and the right side pressure bulkhead panels together.
NOTE: You must connect the left and the right side pressure
____ bulkhead panels together before you install them on the aft pressure bulkhead structure.
(a) Connect the left and the right side pressure bulkhead panels together with the vertical cover and the backing strips.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-59-01
ALL ú ú 09A Page 411 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
(b) Install the screws and the washers to attach the cover and the backing strips.
(2) S 424-216Put the lower left and the right side pressure bulkhead panels against the bulkhead structure.
(3) S 434-217Install the screws to install the panel assembly.
(4) S 424-218Put the upper left and the right side pressure bulkhead panels against the bulkhead structure.
(5) S 434-219Install the screws to install the panel assembly.
(6) S 434-220Put the horizontal cover strips on the lower and the upper panel assemblies and install the screws.
NOTE:____ Install the center horizontal cover strip first. Then alternate between the left and the right side horizontal cover strips. This will make sure the lower and the upper panel assemblies are aligned.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-59-01
ALL ú ú 08A Page 412 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
MAIN DECK CARGO COMPARTMENT LINING - INSPECTION/CHECK
_____________________________________________________
1. General_______
A. This procedure contains a task to do an inspection/check of the main deck sidewall panels, and the ceiling panels.
TASK 25-59-01-206-001
2. Inspection/Check - Main Deck Cargo Compartment Lining_____________________________________________________
A. Access
(1) Location Zone
210 Main Deck
B. Procedure
S 216-002
(1)
Make sure the sidewall panels are not damaged.
S 216-004
(2)
Make sure the sidewall panels are not loose, and the screws and washers are installed.
S 216-005
(3)
Make sure the ceiling panels are not damaged.
S 216-003
(4)
Make sure the ceiling panels are not loose, and the screws and washers are installed.
S 216-007
(5)
Make sure the covers for the flight data recorder and the cockpit voice recorder are in the correct position and that they are secure.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-59-01
ALL ú ú 02 Page 601 ú Oct 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
MAIN DECK CARGO COMPARTMENT INSULATION - INSPECTION/CHECK
_________________________________________________________
1. General_______
A. One task is given in this section. This task is a visual inspection/check of the insulation blankets installed in the main deck cargo compartment.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(145)