• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)  
Break the water-soluble tape on the antenna.

 (b)  
Let the antenna extend automatically.

 (c)  
Disconnect the battery leads (if applicalble).


 S 842-029
 (2)  Adjust the DC power supply.
 (a)  Adjust the voltmeter to the applicable range to measure 10.7 volts dc.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-63-03
 ALL  ú ú 03 Page 201 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (b)  
Connect the voltmeter to the output terminals of the DC power supply.

 (c)  
Move the switch on the DC power supply to the ON position.

 (d)  
Adjust the output to 10.7 volts dc.

 (e)  
Move the switch on the DC power supply to the OFF position.


 S 842-030
 (3)  Prepare for the test.
 (a)  
Attach the radiation indicator to the antenna end of the ELT.

 (b)  
Put the ELT in a horizontal position.


 CAUTION: MAKE SURE THE POLARITY IS CORRECT TO PREVENT DAMAGE TO
_______
 EQUIPMENT.

 (c)  
Connect the output terminals of the DC power supply to the ELT. 1) Connect the positive terminal to the blue test point. 2) Connect the negative terminal to the black test point.

 (d)  
Adjust the squelch and the volume on the communication receiver until background noise is heard clearly.


 S 712-031
 (4)  Do the test of the ELT.
 NOTE:____Do the test fast. Although the antenna is disconnected, a weak emergency signal is transmitted.
 (a)  
Tune the communication receiver to 121.5 MHz. 1) Move the switch on the DC power supply to the ON position. a) Make sure the 121.5 and 243.0 MHz lamps come on moderately. b) Make sure you hear the emergency signal from the

 communication receiver. 2) Move the switch on the DC power supply to the OFF position.

 (b)  
Tune the communications receiver to 243.0 MHz. 1) Move the switch on the DC power supply to the ON position.


 a)  Make sure you hear the emergency signal from the communication receiver.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-63-03
 ALL  ú ú 03 Page 202 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 2) Move the switch on the DC power supply to the OFF position.
 (c)  
Disconnect the DC power supply from the ELT.

 (d)  
Move the switch on the communication receiver to the OFF position.


 TASK 25-63-03-002-030
 3. Battery Removal
_______________
 A. Access
 (1)  Location Zone
 200 Upper Half Fuselage

 B. Procedure
 S 032-020
 (1)  
Hold the transmitter in the inverted position, push the battery cover in and turn it until the open slots are aligned with the tabs on the battery casing.

 S 032-019

 (2)  
Remove the battery cover and the battery cushion.

 S 032-018

 (3)  
Remove the sleeving from the battery lead connectors.

 S 432-016

 (4)  
Remove the solder from the sheath connectors and disconnect the battery leads.

 S 022-017

 (5)
Remove the battery; pull it carefully out of the battery casing.


 TASK 25-63-03-402-011
 4. Battery Installation
____________________
 A. Special Tools and Equipment
 (1)  
Battery

 (2)  
Heat Gun

 (3)  
Soldering Iron


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-63-03
 ALL  ú ú 03 Page 203 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(154)