• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (e)  
On the P130 Main Deck Cargo Handling Power Panel

 (f)  
On the P133 Main Deck Cargo Handling Power Panel

 (g)  
On the P134 Main Deck Cargo Handling Power Panel

 (h)  
On the P135 Main Deck Cargo Handling Power Panel

 


 S 864-187
 (10)
 Supply the electrical power (AMM 24-22-00/201).

 S 214-188

 (11)
 Make sure the sidewall light operates correctly.

 S 714-189

 (12)
 Do a check of the operation of the applicable control panel (AMM 25-57-00/501).

 S 864-190

 (13)
 Remove the electrical power if it is not necessary
 (AMM 24-22-00/201).

 

 E. Install the Main Deck Dado Panels
 S 424-191
 (1)  
Put the dado panel in its position.

 S 434-192

 (2)  
Install screws and washers to attach the dado panel to the lower sidewall panel.

 (3)  
Put the seals between the dado panel and the floor panel.

 (4)  
Connect the electrical connectors if they are applicable.


 S 434-193
 S 434-194
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-59-01
 ALL  ú ú 08A Page 409 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 F. Install the Main Control Station Panel
 S 424-195
 (1)  
Put the main control station panel in its position.

 S 434-196

 (2)
Install quick-release fasteners to the main control station panels.

 S 434-197

 (3)  
Do these steps to install the control panels and the intercom panel:

 (a)  
Remove the caps from the electrical connectors.

 (b)  
Put the control panels and the intercom panel in position.

 (c)  
Connect the electrical connectors.

 (d)  
Install the screws to attach the control panels and the intercom panel to the main control station panel.

 


 S 434-198
 (4)
Install the interphone unit to the main control station panel.

 S 434-199

 (5)  
Install the screws and washers to attach the cover strips to the main control station panel.


 G. Install the Main Deck Ceiling Panels
 NOTE: There are different types of main deck ceiling panels, but the
____ basic installation for these panels are the same. Only do the steps that are necessary to install the applicable panel.
 S 424-200
 CAUTION: BE CAREFUL WHEN YOU TOUCH THE PANELS AND INSULATION BLANKETS.
_______ THESE ITEMS CAN GET DAMAGED OR TORN. IF YOU USE A LADDER OR SUPPORT EQUIPMENT , REFER TO AMM 20-09-01/201, FLOOR PANEL PROTECTION, TO PREVENT FLOOR PANEL DAMAGE.
 (1)  
Put the ceiling panel in its position.

 (2)  
Install the screws and washers to the ceiling panel.

 S 434-203

 (3)  
Connect the electrical connectors above the ceiling panel if they are applicable.


 S 434-202
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-59-01
 ALL  ú ú 08A Page 410 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 434-204
 (4)  
Install the screws and washers to attach the light fixture to the ceiling panel if it is applicable.

 S 434-205

 (5)  
Install the screws and washers to attach the decompression vent grill to the ceiling panel if it is applicable.

 S 434-206

 (6)  
Install the screws and washers to attach the smoke detection panel to the ceiling panel if it is applicable.

 S 414-207

 (7)  
Install the screws and washers to attach the access panel to the ceiling panel if it is applicable.

 S 434-208

 (8)  
Install the screws and washers to attach the cover strips to the ceiling panel.

 S 864-210
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(144)