• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (4)  
Weigh and record the empty weight of the gas cylinder.


 S 972-030
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-04
 ALL  ú ú 02 Page 208 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 

NOT INSTALLED ON ALL AIRPLANES
Gas Reservoir Actuator Figure 202
K17181
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-04
 ALL  ú ú 02 Page 209 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
PORT FOR BOLT SAFETY
(LATER CONFIGURATION)

LEVER
VIEW PORT
COCKING ROD
PORT FOR BOLT SAFETY
(EARLY CONFIGURATION)

COCKING ARM WARNING: UNCOCKED POSITION.
STEP 1  STEP 2
LANYARD
(TYPICAL)
STOP PIN
BALL END
REMOVE ROD
WARNING: COCKED POSITION.
STEP 3  STEP 4
Cocking and Arming Regulator Valve
Figure 203

K17182
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-04
 ALL  ú ú 02 Page 210 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

PORT FOR BOLT SAFETY (EARLY CONFIGURATION)
STREAMER
NUT
BOLT SAFETY
COCKING ARM
EARLY CONFIGURATION

PORT FOR BOLT SAFETY (LATER CONFIGURATION)
STREAMER
NUT
BOLT SAFETY
COCKING ARM
LATER CONFIGURATION

Installing Bolt Safety
Figure 204

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-04
 ALL  ú ú 02 Page 211 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
K17185
A
747-400 MAINTENANCE MANUAL
 S 612-067
 WARNING:_______ HOLD THE CHARGE FITTING HOSE.  USE A GUARD TO PREVENT INJURY OR
 DAMAGE TO THE EQUIPMENT IF THE CHARGE FITTING HOSE BECOMES
 UNSERVICEABLE.

 CAUTION: EXAMINE THE GAS CYLINDER TO MAKE SURE THAT THE COMPONENTS ARE
_______ IN ALL OF THE WEIGHINGS TO GIVE THE TOTAL WEIGHT OF THE GAS.
 (5)  Connect a hose to the output side of the portable servicing unit and the inlet charge fitting on the gas cylinder. Balance the scale (Fig. 205).
 NOTE: Keep the gas cylinder on the scale during the pressurization
____ of N2 to prevent more than the necessary quantity of gas.
 S 612-032
 (6)  
Connect the N2 source to the input side of the portable servicing unit.

 S 612-033

 (7)  
Open the charge fitting on the gas cylinder.

 S 612-034

 (8)  
Turn on the air supply. Adjust the pressure to 145-155 psig.

 S 612-035

 (9)  
Open the valve on the N2 storage cylinder. Adjust the pressure to 300-500 psig.

 S 612-036

 (10)
 Continue pressurization until the weight of the gas cylinder has the weight of N2 at 9.38 - 9.42 pounds at 70 degrees F.

 S 612-037

 (11)
 Close the air supply to the portable servicing unit.

 S 612-038

 (12)
 Close the charge fitting on the gas cylinder.

 S 422-039

 (13)
 Torque the nut to 120-130 inch pounds.

 (14)
 Disconnect the hose from the charge fitting.

 (15)
 Close the valve on the N2 storage cylinder.


 S 482-040
 S 612-041
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(174)