• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 25-57-09-004-001
 2.  Side Door Master Cargo Control Panel Removal (Fig. 401)
____________________________________________
 A.  Access
 (1)  Location Zone
 210 Main Deck

 B.  Procedure
 S 864-002
 (1)  Open this circuit breaker and attach a DO-NOT-CLOSE tag:
 (a)  P415, Power Distribution Center Right Panel 1) 415F18, CARGO HANDLING CONT MN DK
 S 034-003
 (2)  
Turn the three quick-release fasteners counterclockwise to release the forward end of the control panel from the lining.

 S 014-024

 (3)  
Open the control panel.

 S 034-004

 (4)  
Remove the screws that attach the wire bundle clamps to the lining.

 S 034-023

 (5)  
Disconnect the electrical connector plugs (P1, P2 and P4) from the electrical receptacles (DM1A, DM1B and DM1C).

 S 034-006

 (6)  
Pull the wire bundle out of the hole in the lining.

 S 034-007

 (7)  
Remove the screws that attach the hinge on the control panel to the lining.

 (8)  
Remove the control panel.


 S 024-021
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-09
 ALL  ú ú 02 Page 401 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL 
DOOR (REF) SIDE CARGO 
ASEE SIDE DOOR MASTER CARGO CONTROL PANEL (M1) 
REVEAL LINING 
HINGE  1  CONTROL PANEL (M1) MASTER CARGO QUICK-RELEASE FASTENER (3 LOCATIONS)
SIDE DOOR (REF) CONTROL PANEL 
WIRE BUNDLE 
FWD 
ELECTRICAL (P1, P2, P4) CONNECTORS  INBD 
1  AFA COMBIS  A MASTER CARGO CONTROL PANEL (M1) 

Side Door Master Cargo Control Panel Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-09
 ALL  ú ú 05 Page 402 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 TASK 25-57-09-404-008
 3.  Side Door Master Cargo Control Panel Installation (Fig. 401)_________________________________________________
 A. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 25-57-00/501, Main Deck Cargo Handling System


 B. Access
 (1)  Location Zone
 210 Main Deck

 C. Install the Master Cargo Control Panel
 S 864-009
 (1)  
Make sure the 415F18 CARGO HANDLING CONT MN DK circuit breaker is open on the P415 Power Distribution Center Right Panel.

 S 424-010

 (2)  
Attach the hinge on the control panel to the lining with the screws.

 S 434-011

 (3)  
Push the wire bundle through the hole in the lining.

 S 434-012

 (4)  
Connect the electrical connector plugs (P1, P2 and P4) to the electrical receptacles (DM1A, DM1B and DM1C).

 S 434-026

 (5)
Attach the wire bundle clamps to the lining with the screws.

 S 414-014

 (6)  
Close the control panel.

 S 434-027

 (7)  
Turn the three quick-release fasteners clockwise to lock the control panel to the lining.

 S 864-015

 (8)
Remove the DO-NOT-CLOSE tag and close this circuit breaker:


 (a)  P415, Power Distribution Center Right Panel 1) 415F18, CARGO HANDLING CONT MN DK
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-57-09
 ALL  ú ú 08 Page 403 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 D. Do a Test of the Master Cargo Control Panel
 NOTE: This test will make sure there is electrical power supplied to the
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(91)