25-58-03
 ALL  ú ú 01 Page 404 ú Feb 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL 
CHANNEL 
SIDE RAIL (10 LOCATIONS) 
CASTER  
CARGO TIEDOWN  (8 LOCATIONS)  
FITTING  
(3 LOCATIONS)  TENSION STUD  
(11 LOCATIONS)  
RETRACTABLE  
RESTRAINT UNIT  
(10 LOCATIONS)  
C  BEAM  
C  (2 LOCATIONS)  
A  
B  OUTBD  FWD 
SCREW, WASHER AND NUT (4 LOCATIONS PER CASTER) 
B A 
RESTRAINT HOUSING RESTRAINT/CASTER UNIT
SHEAR PLUNGER(7 LOCATIONS) LEVER RETRACTABLELOCKHEAD RESTRAINT LOCKHEAD RESTRAINTRELEASE LATCH SCREW 
RESTRAINT BEAM 
SHEAR PLUNGER LEVER HOUSING 
SHEAR PIN RESTRAINT UNIT TENSION STUD INBD BEAM A-A 
CASTERS SIDE RAIL 
CARGO TIEDOWN FITTING 
SCREW, WASHER AND NUT (4 LOCATIONS PER CASTER) 
TENSION STUD 
B-B  C-C 
Restraint/Caster Unit Installation Figure 401 
C76774
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 25-58-03
 ALL  ú ú 03 Page 405 ú Oct 10/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 DIRECTIONAL GUIDE PANEL - REMOVAL/INSTALLATION
______________________________________________
 1.  General
_______
 A.  This procedure contains these tasks:
 (1)  
A removal of the directional guide panel.
 (2)  
An installation of the directional guide panel.
 B.  The directional guide panel is on the centerline of the main deck cargo, at the body station 520.
 TASK 25-58-04-004-001
 2.  Directional Guide Panel Removal (Fig. 401)
_______________________________
 A.  Access
 (1)  Location Zone
 813L No. 1 Main Door
 B.  Procedure
 S 034-002
 (1)  Turn the bolts 90 degrees to the unlocked position at both sides of the panel.
 NOTE: The placards at the panel edge show the locked position of
____
 the bolts.
 S 024-003
 (2)  Lift the directional guide panel and remove.
 TASK 25-58-04-404-004
 3.  Directional Guide Panel Installation (Fig. 401)
____________________________________
 A.  Access
 (1)  Location Zone
 831L No. 1 Main Door
 B.  Procedure
 S 214-005
 (1)  
Make sure the bolts are in the unlocked position.
S 424-006
 (2)  
Put the directional guide panel in its position on the centerline of the airplane.
 (3) 
Make sure the shear studs are in the cargo tracks correctly.
 S 824-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 25-58-04
 ALL  ú ú 01 Page 401 ú Oct 10/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 424-008
 (4)  Turn the bolts 90 degrees to the locked position at both sides of the panel.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 25-58-04
 ALL  ú ú 01 Page 402 ú Oct 10/93 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
747-400 
MAINTENANCE MANUAL
MOVABLE DIRECTIONAL GUIDE  CASTER (6 POSITIONS)  
LATCH GUIDE 
SHEAR STUD 
BOLT 
DIRECTIONAL GUIDE PANEL 
Direction Guide Panel Installation 
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-58-04 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(127)