 (12)
 Move the escape slide to make sure it moves freely along the tracks.

 (13)
 Put the escape slide in the aft (stowed) position.


 S 862-014-002
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-00
 ALL  ú CONFIG 2 ú 02 Page 206 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 FLOOR-MOUNTED ESCAPE SLIDE - ADJUSTMENT/TEST
____________________________________________
 1.  General_______
 A.  This procedure contains three tasks:
 (1)  
An operational test of the slide mechanism

 (2)  
An adjustment of the slide mechanism

 (3)  
A system test of the slide mechanism


 B.  This procedure refers to the escape slide at the upper deck door as "the slide".
 TASK 25-68-00-705-001-002
 2.  Operational Test - Floor-Mounted Escape Slide (Fig. 501)_____________________________________________
 A.  General
 (1)  
Before you deploy the slide, it must be inboard of the upper deck door, the door closed and the safety pins from the stored gas bottle removed.

 (2)  
To deploy the escape slide, pull up the packboard release handle and lift the inboard side of the slide assembly to tilt it through the open doorway.

 (3)  
The chute and the slide pack apply tension on the release lanyards which release the cover and allow the slide to unfurl outside the doorway. With the final degrees of rotation, a cable connected to the packboard hinge, actuates the stored gas bottle.

 (4)  
If the stored gas bottle does not fire, it can be actuated by pulling inboard on the manual inflation handle.


 B.  Special Tools and Equipment
 (1)  Crew Service Door Opening Safety Barrier - 6PRE65B00040
 C.  References
 (1)  AMM 25-68-02/401, Floor Mounted Escape Slide Unit
 D.  Access
 (1)  
Location Zone
 224 Fwd Upper Deck, RH


 (2)  
Access Panel
 849R Upper Deck Emergency Door, RH

 

 E.  Prepare for the test.
 S 865-004-002
 (1)  
Put the escape slide in the test position.

 (a)  
Unlock the slide assembly to let it move along the tracks.

 (b)  
Move the slide assembly forward to put it adjacent to the door opening.

 (c)  
Lock the slide assembly to the tracks.

 

 (2)  
Open the upper deck door.


 S 865-005-002
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-00
 ALL  ú CONFIG 2 ú 02 Page 501 ú Feb 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

SEE ASEEB D
FLOOR-MOUNTED
ESCAPE SLIDE

UPPER DECK COMPARTMENT 
RUBBER PADS  INFLATION FIRING CABLE 
A  ESCAPE SLIDE PACK 

CHUTE PACKBOARD EXTENSION PANEL
SHROUD ESCAPE SLIDE GAS SUPPLY HOSE
CHUTE-TO-DOOR MANUAL
SILL LATCH INFLATION HANDLE
PACKBOARD GIRT RETAINING NUT AND WASHER
SLIDE GIRT (4 LOCATIONS)
BAR RELEASE RING GIRT BAR RETAINER CHANNEL
SLIDE INFLATION
CHUTE STORED GAS BOTTLE CHUTE-TO-DOOR
SEE C SILL LATCH ACTUATION CABLE
GAS HOSE CHUTEDISCONNECT
TORQUE TUBE SWIVEL FITTING
MANUAL INFLATION FLOOR
HANDLE RELEASE TRACKS A
CABLE (ATTACH TO FOLLOWER ARM) INBD FWDBASE ASSEMBLY (PLATFORM)
SLIDE IN OPERATION-READY POSITION
A
Floor-Mounted Escape Slide Operational Test Figure 501 (Sheet 1)
B40512
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-68-00
 ALL  ú CONFIG 2 ú 02 Page 502 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn