C80124
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-06
 ALL  ú ú 04 Page 403 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


RESTRAINT ASSEMBLY
FLOOR BEAM ATTACHMENT

TIEBACK STRAP ATTACHMENT


Cargo Barrier Net Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-06
 ALL  ú ú 04 Page 404 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C80125
A 747-400 MAINTENANCE MANUAL
UPPER SUPPORT

Cargo Barrier Strap Installation
Figure 402

C80128
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-06
 ALL  ú ú 04 Page 405 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 B. Procedure
 S 414-083
 (1)  
Put the net in its position correctly in relation to the upper floor beam.

 S 434-084

 (2)  
Install the bolts to connect the straps to the upper support attachment fittings.

 S 434-085

 (3)  
Install the bolts to connect the straps to the side attachment fittings.

 S 434-086

 (4)  
Install the bolts that are behind the sidewall panels to connect the straps to the lower ends of the side attachment fittings.

 S 434-087

 (5)  
Install the bolts to connect the straps to the floor beam fittings.

 S 424-088

 (6)  
Install the tie-back straps in the correct positions.


 NOTE: Hand tighten the tie-back straps to approximately 30 pounds
____ tension to hold the net in position so the minimum clearance of 0.5 inch from the control cables is maintained.
 S 414-091
 (7)  
Install the sidewall panels.

 (8)  
Install the contoured ceiling panels.


 S 414-092
 TASK 25-58-06-404-090
 5. Cargo Barrier Strap Installation (Fig. 402)
________________________________
 A. Access
 (1)  Location Zones
 231 Main Deck Body Sta 488 to 854, Left
 232 Main Deck Body Sta 488 to 854, Right

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-06
 ALL  ú ú 08 Page 406 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 B. Procedure
 S 434-093
 (1)  
At the nearest center of the airplane, hold the straps in position and install the quick-release pins to attach the straps to the upper support.

 S 434-094

 (2)  
Do the same for the remaining straps.

 S 424-096

 (3)  
Install the bolts to attach the straps to the side supports.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-58-06
 ALL  ú ú 09 Page 407 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 MAIN DECK CARGO BARRIER NETS - INSPECTION/CHECK
_______________________________________________
 1.  General
_______
 A.  This procedure contains a task to do an inspection/check of the main deck cargo barrier net and the cargo barrier strap.
 