• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-09 10:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

1 DIVIDER NET MUST BE REMOVED WHEN
DC
BAY 10 IS CONFIGURED FOR HANDLING TWO ADDITIONAL CONTAINERS
Bulk Cargo Compartment Cargo Restraining Nets Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-55-01
 ALL  ú ú 01 Page 402 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 034-049
 (4)  
Disconnect the tiedown fittings from the anchor plates at the top of the divider net.

 S 024-050

 (5)  
Remove the divider net.


 TASK 25-55-01-404-051
 3. Bulk Cargo Compartment Cargo Nets Installation (Fig. 401)
______________________________________________
 A. References
 (1)  
52-36-00/001, Bulk Cargo Door

 (2)  
IPC 25-55-01


 B. Access
 (1)  Location Zones
 145 Bulk Cargo Compartment, Left
 146 Bulk Cargo Compartment, Right

 C. Install the Cargo Restraint Nets
 S 434-052
 (1)
Connect the tiedown fittings to the anchor plates in the ceiling.

 S 434-053

 (2)  
Connect the tiedown fittings to the anchor plates in the sidewall and the floor.

 S 434-054

 (3)
Connect the snap latches to the nets which attach to each other.

 S 434-055

 (4)
Tighten the net straps to increase the tension in the net straps.

 S 414-061

 (5)  
Close the bulk cargo door (Ref 52-36-00/001).


 D. Install the Compartment Divider Net
 S 434-056
 (1)
Connect the tiedown fittings to the anchor plates in the ceiling.

 (2)  
Connect the net strap hooks to the fittings in the floor.

 (3)
Tighten the net straps to increase the tension in the net straps.


 S 434-057
 S 434-058
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-55-01
 ALL  ú ú 05 Page 403 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 414-062
 (4) Close the bulk cargo door (Ref 52-36-00/001).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-55-01
 ALL  ú ú 04 Page 404 ú Jun 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 BULK CARGO COMPARTMENT CARGO NETS - INSPECTION/CHECK
____________________________________________________
 1.  General_______
 A.  There is one task in this procedure. The task is a visual
 inspection/check of the cargo nets installed in the bulk cargo
 compartment.

 TASK 25-55-01-206-001
 2.  Do an Inspection/Check of the Cargo Nets________________________________________
 A.  Access
 (1)  Location Zone
 145 Bulk Cargo Compartment, Left
 146 Bulk Cargo Compartment, Right

 B.  Procedure
 S 216-002
 (1)  Make sure there is no damage to the net straps, net fabric, tie-down fittings, and snap hooks.
 (a)  
Replace the damaged nets, tie-down fittings, or snap hooks, if it is necessary.

 (b)  
Repair the damaged net straps, net fabric, tie-down fittings, or snap hooks, if it is necessary.


 S 216-005
 (2)  
Make sure the tie-down fittings keep the cargo nets attached to the ceiling, the floor, and the sidewall.

 S 216-006

 (3)  
Make sure the snap hooks keep the cargo nets attached to the O-rings and D-rings.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(32)