(b)
Gain adjustment, with a power cable and a digital voltmeter, of the power lever angle (PLA) (alternate procedure)
(c)
Differential voltage check of the PLA rotary variable differential transducer (RVDT) of the MEC: 1) PMC Tester Power Supply Unit 2) Digital Voltmeter (Alternate Procedure)
(d)
Test of the PMC and related components - (PMC Tester Kit): 1) N1 speed sensor 2) T12 temperature sensor of the fan inlet 3) PS12 static pressure transducer of the fan inlet 4) N2 control alternator 5) Torque motor (TM) 6) The transducer for the power lever angle (PLA).
NOTE: To help locate a possible intermittent failure of
____ the RVDT, operate the engine at ground idle for a minimum of 5 minutes to increase the temperature of the RVDT.
7) The PMC electronics and the closed loop simulation with the PLA flight compartment setting
8) PMC ON/INOP - warning light and switch in the flight compartment.
(e) PMC and related components tests - (PMC Resistance Tester): 1) The transducer for the power lever angle (PLA) 2) Torque motor (TM) 3) N2 control alternator
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
73-21-00
ALL ú ú C02 Page 501 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
4) N1 speed sensor 5) T12 temperature sensor of the fan inlet 6) PMC switch
(f)
PMC and related components - alternate tests - (Digital Voltmeter and Test Leads): 1) The transducer for the power lever angle (PLA) 2) Torque motor (TM) 3) N2 control alternator 4) N1 speed sensor 5) T12 temperature sensor of the fan inlet 6) PMC switch
(g)
PMC warning light without the PMC Tester Kit
(2)
You can use alternate procedures to do each test.
(a)
The PMC Tester gives local "Pass" or "Fail" data for the PMC and the related components.
(b)
The PMC Resistance Tester (available from CFM International) measures the resistance of each component with a built-in digital voltmeter.
(c)
The alternate procedure checks the resistance of each component with a digital voltmeter and test leads.
(3)
You must do the test for the gain adjustment for the PLA transducer after you replace:
(a)
The power management control (PMC)
(b)
The main engine control (MEC)
(c)
The PMC wiring harness
B. Equipment
(1)
Multimeter - Digital (optional), capable of
measuring 7.5 |0.02 volts AC and 2.5 ohms to 10
megohms, local purchase
(2)
Pin - Part Power Rig, C76001-1 (kept in
airplane fly-away kit found in electronics
compartment [kit is attached to the
forward-outboard leg of the battery support])
or equivalent 0.248 (+0.000/-0.003) inch
diameter, 2.5 inches long rod or bolt.
(3)
Power Cable (optional) - 856A1262, Engine to
Engine (100 feet) (30.5 m), (856A1262 is
superseded by 856A1330)
(4)
Power Cable Kit (optional) - 856A1330, CFM
International
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
73-21-00
ALL ú ú C02 Page 502 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
(5)
PMC Tester Kit - 856A1273G03
(856A1273G02 is superseded by
856A1273G03)
-856A1326G01 (856A1273G03 is superseded by 856A1326G01)
(6)
PMC Resistance Tester - 856A1366G01, CFM
International
(7)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机燃油和控制(72)