• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 11:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (17) Carefully remove the MEC from the fuel pump.
 NOTE: Do not damage the drive shaft.
____
 (a)  
Move the MEC aft, then left and forward until it is away from the engine.

 (b)  
Remove the seal gasket from the mounting flange.


 CAUTION: REPLACE THE FUEL PUMP/MEC GASKET IF IT IS DAMAGED
_______ (AMM 70-30-01/201). DAMAGED GASKETS CAN CAUSE FUEL LEAKS.
 (c)  
Replace the gasket if it is damaged (AMM 70-30-01/201).

 (d)  
Install the coverplate on the forward face of the MEC.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-01
 ALL  ú ú C03 Page 420 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 864-031-C00
 (18) If it is necessary, do the MEC preservation procedure (AMM 73-00-00/201).
 S 034-032-C00
 CAUTION:_______DO NOT TRY TO REMOVE THE END FITTING OF THE VSV ROD. THE REMOVAL OF THIS FITTING CAN CAUSE DAMAGE TO THE MEC.
 (19) Remove these fittings and discard the O-rings from the MEC ports (Fig. 407, 408 and 409):
 NOTE: This step is not necessary if the MEC to be installed has all
____
 the fittings installed.

 (a)
Discard the O-rings from the MEC ports.

 (b)
VBV OPEN port

 (c)
VSV HEAD port

 (d)
TC1 port

 (e)
TC2 port

 (f)
PCR port

 (g)
Heated servo supply (FUEL-OUT) port

 (h)
POC (PS12 Line) port

 (i)
PB port

 (j)
P6 port

 (k)
CDP port

 (l)
CBP port

 (m)
Upper overboard drain port (90° elbow and fitting)

 (n)
Lower overboard drain port (45° elbow and fitting)

 (o)
P7 port.


 S 034-034-C00
 (20) Put the protective caps on the plumbing lines and the open ports on the MEC and the fuel pump.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-01
 ALL  ú ú C05 Page 421 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
SEE  A
VBV OPEN END PORT  VBV CLOSED END FITTING AND PORT  A 
B  B 

CDP (PS3) PORT
CBP PORT
CC A
A
MEC Port Locations Figure 407 (Sheet 1)
E35280
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-01
 ALL  ú ú C02 Page 422 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
PC PORT 1
TC3 PORT 1
VBV OPEN 
END PORT  RIGHT END VIEW 
A-A 
HEATED SERVO
SUPPLY PORT 
VBV CLOSED 
END PORT 
PCR PORT 
OVERBOARD 
DRAIN PORT 
CBP PORT 
CDP (PS3) 
PORT 
TOP VIEW  BOTTOM VIEW 
B-B  C-C 
1  ON ENGINES WITHOUT THE HPTCC 
TIMER, THE PC AND TC3 PORTS 
ARE PLUGGED 
MEC Port Locations 
Figure 407 (Sheet 2) 

E35282
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-01
 ALL  ú ú C01 Page 423 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机燃油和控制(104)