(e)
Install the N1 speed sensor connector on the receptacle that is found aft of the oil tank at the 4 o'clock position between flanges J and K.
(f)
Install the T12 electrical lead connector on the T12 sensor found on the fan inlet duct at the 3 o'clock position.
(g)
Install the cable connector on the receptacle J3 on the lower surface of the PMC.
(h)
Make sure the wiring harness is not twisted.
1) Connect all the clamps.
S 414-009-C00
(2) Close the fan cowl panels (AMM 71-11-02/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
73-21-06
ALL ú ú C01 Page 407 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
TASK 73-21-06-404-010-C00
5. Speed Sensor Cable for the N2 Control Alternator Installation_____________________________________________________________
A. General
(1) For this procedure the N2 control alternator speed sensor cable will be referred to as the speed sensor cable.
B. Equipment
(1) Pliers - padded jaw - connector type 8498-03
C. References
(1) AMM 71-11-02/201, Fan Cowl Panels
D. Access
(1)
Location Zones
502/602 Left Fan Cowl Panels
503/603 Right Fan Cowl Panels
506 Engine No. 1 - Fan Frame
606 Engine No. 2 - Fan Frame
(2)
Access Panels
5737L Engine No. 1 - Right Fan Cowl Panel
5746L Engine No. 1 - Left Fan Cowl Panel
5837R Engine No. 2 - Right Fan Cowl Panel
5846R Engine No. 2 - Left Fan Cowl Panel
E. Procedure
S 424-011-C00
(1) Do these steps to install the speed sensor cable (Fig. 402):
(a) Put the speed sensor cable over the top of the fan case along flange D between the speed sensor, at the top of the AGB and the PMC receptacle, J2.
CAUTION: CAREFULLY ALIGN THE BUILT-IN KEY OF THE CONNECTOR WITH THE
_______ KEYWAY RECEPTACLE BEFORE YOU CONNECT IT TO PREVENT DAMAGE. MOVE ALL OF THE LOOSE CABLE ALONG THE CABLE. DO NOT PERMIT THE CABLE SHEATH TO TOUCH THE ADJACENT COMPONENTS. DO NOT TWIST THE SHEATH BY MORE THAN 180 DEGREES. IF YOU DO NOT OBEY THIS PRECAUTION, DAMAGE TO THE EQUIPMENT CAN OCCUR.
(b) Install the electrical connectors of the cable with the procedure that follows: 1) Remove the dust caps. 2) Engage the connector with its mating receptacle.
a) Turn the knurled coupling ring while you move the back shell assembly back and forth.
3) After you fully engage the connector with your hand, tighten the coupling ring with a pair of padded-jaw connector pliers.
4) Make sure the connector is fully engaged. a) The movement of the connector is not permitted.
(c) Install the connector on the speed sensor.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
73-21-06
ALL ú ú C01 Page 408 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
(d) (e) Install the connector on the PMC receptacle, J2.Make sure the cable is not twisted. 1) Connect all of the clamps.
(2) S 414-013-C00Close the fan cowl panels (AMM 71-11-02/201).
(3) S 714-014-C00Do a test of the PMC cable (AMM 73-21-00/501).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
73-21-06
ALL ú ú C01 Page 409 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
N2 CONTROL ALTERNATOR SPEED SENSOR - REMOVAL/INSTALLATION
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机燃油和控制(130)