• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 11:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
POWER MANAGEMENT CONTROL PANEL - REMOVAL/INSTALLATION
_____________________________________________________
 1.  General
_______
 A.  The power management control (PMC) panel is found on the P5-68 engine module. The P5-68 engine module is found on the aft overhead panel of the flight compartment. The PMC panel is attached by four fasteners. Access to the electrical connectors is on the rear of the PMC panel. You must remove the PMC panel from the overhead panel to get access.
 TASK 73-21-12-004-001-C00
 2.  Remove the PMC Panel
____________________
 A.  References
 (1)  AMM 24-22-00/201, Manual Control
 B.  Access
 (1)  Location Zone 102 Control Cabin - Right, aft overhead panel
 C.  Procedure (Fig. 401)
 S 864-002-C00
 (1)  Remove electrical power (AMM 24-22-00/201).
 (a)  Set the BAT switch on the Electrical Meters Battery and Galley Power Module (P5-13) to the OFF position and install a DO-NOT-OPERATE tag.
 S 024-003-C00
 (2)  Remove the PMC panel from the aft overhead panel.
 S 034-015-C00
 CAUTION: CROSS CONNECTION OF THE PMC PANEL (ON THE P5 OVERHEAD PANEL) IS
_______ A POSSIBILITY WHEN WORKING WITH THIS COMPONENT. CLEARLY IDENTIFY CONNECTIONS BEFORE DISCONNECTING.
 (3)  Disconnect the electrical connectors.
 TASK 73-21-12-404-004-C00
 3.  Install the PMC Panel
_____________________
 A.  References
 (1)  AMM 33-15-00/501, Master Warning and Caution Lights
 B.  Access
 (1)  Location Zone 102 Control Cabin - Right, aft overhead panel
 C.  Procedure
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-12
 ALL  ú ú C02 Page 401 ú Mar 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////


A

Power Management Control Panel Location
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 73-21-12
 ALL  ú
 ú  C01  Page 402
 ú  Mar 15/94 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
S 434-016-C00
 CAUTION: CROSS CONNECTION OF THE PMC PANEL (ON THE P5 OVERHEAD PANEL) IS
_______ A POSSIBILITY WHEN WORKING WITH THIS COMPONENT. POSITIVELY IDENTIFY CONNECTIONS BEFORE CONNECTING AND FUNCTION CHECK UPON COMPLETION OF CONNECTION.
 (1)  
Connect the electrical connectors to the control panel.

 S 424-006-C00

 (2)  
Install the PMC panel in the aft overhead panel.


 NOTE: Attach the panel with fasteners (four locations).
____
 S 864-007-C00
 (3)  Remove the DO-NOT-CLOSE tag and close this circuit breaker:
 (a)  P6-2 Load Control Center
 1) ENGINES MASTER CAUTION

 S 714-008-C00
 (4)  Put the PMC ON/INOP switch on the control panel in the off position.
 (a)  Make sure that the PMC INOP warning light is on.
 S 714-009-C00
 (5)  Move the PMC ON/INOP switch to the ON position.
 (a)  Make sure that the PMC INOP warning light goes off.
 S 864-010-C00
 (6)  
Move the PMC ON/INOP switch to the off position.

 S 714-012-C00

 (7)  
Do the Master Caution Dim Test for the Reverser (AMM 33-15-00/501).

 S 714-013-C00

 (8)  
Do the Master Caution Dim Test for the Low Idle lights (AMM 33-15-00/501).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机燃油和控制(143)