 31-25-00
 ALL  ú ú 04 Page 503 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 CLOCKS - REMOVAL/INSTALLATION
_____________________________
 1.  General_______
 A.  This procedure has two tasks. The first task is the removal of a clock. The second task is the installation of a clock.
 B.  There are two clocks; one in the captains instrument panel P1 and one in the first officers instrument panel P3.
 TASK 31-25-11-004-005
 2.  Clock Removal_____________
 A.  Access
 (1)  Location Zones
 101 Control Cabin, LH
 102 Control Cabon, RH

 B.  Procedure
 S 024-001
 (1)  Remove the clock:
 (a)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 1)  P6 Load Control Center
 a) CLOCK
 b) CLOCK DISPLAY


 (b)  
Loosen the top right and the bottom left clamp screws of the clock to be removed.


 NOTE:____The clocks use four clamp screws. The top left and bottom right screws hold the mounting clamp to the instrument panel. The top right and bottom left hold the clamp against the clock.
 CAUTION: DO NOT TOUCH THE CONNECTOR PINS OR OTHER CONNECTORS ON THE
_______ CLOCK. IF YOU TOUCH THESE CONDUCTORS, ELECTROSTATIC DISCHARGE CAN CAUSE DAMAGE TO THE CLOCK.
 (c)  
Move the clock out of the panel.

 (d)  
Disconnect the electrical cable.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-25-11
 ALL  ú ú 02 Page 401 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 31-25-11-404-002
 3.  Clock Installation
__________________
 A.  References
 (1) AMM 24-22-00/201, Manual Control (Apply Power)
 B.  Access
 (1)  Location Zones
 101 Control Cabin, LH
 102 Control Cabin, RH

 C.  Procedure
 S 424-003
 (1) Install the clock:
 (a) Make sure these circuit breakers are open:
 1)  P6 Load Control Center
 a) CLOCK
 b) CLOCK DISPLAY

 CAUTION: DO NOT TOUCH THE CONNECTOR PINS OR OTHER CONNECTORS ON THE
_______ CLOCK. IF YOU TOUCH THESE CONDUCTORS, ELECTROSTATIC DISCHARGE CAN CAUSE DAMAGE TO THE CLOCK.
 (b)
Connect the electrical cable to the clock.

 (c)
Move the clock into the panel.

 (d)
Tighten the top right and the bottom left clamp screws.


 S 864-007
 (2)
Supply electrical power (AMM 24-22-00/201).

 S 714-006

 (3)
Do a test of the clock operation:


 (a) Close these circuit breakers:
 1)  P6 Load Control Center
 a) CLOCK

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-25-11
 ALL  ú ú 02 Page 402 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 b) CLOCK DISPLAY
 (b)  
Set the clock to the Greenwich Mean Time (GMT).

 (c)  
Let the clock operate for not less than two minutes.

 (d)  
Make sure the clock shows the correct time.


 S 864-004
 (4)  Remove the electrical power if it is not necessary (AMM 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-25-11
 ALL  ú ú 01 Page 403 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 AURAL WARNING SYSTEM - DESCRIPTION AND OPERATION
________________________________________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 仪表 INSTRUMENTS(122)